
HE Series Central Chillers
•
882.03862.00
• 12/02/2021
v
Optional Operating Voltages ................................................................... 20
Chapter 4:
Chiller - Installation ............................................................................................ 21
4-1
Uncrating ................................................................................................21
4-2
Chiller Foundation ..................................................................................21
4-3
Chiller Unit Location ...............................................................................21
4-4
Chiller Rigging Instructions .....................................................................21
4-5
Process Water Connections ...................................................................23
4-6
Flow and Pressure Considerations .........................................................24
4-7
Galvanic Corrosion Considerations ........................................................24
4-8
Water Treatment Considerations ............................................................24
4-9
Refrigeration Circuit and Water Condenser Piping .................................25
4-10
Checking Motor Direction .......................................................................26
4-11
Tank Temperature Considerations .........................................................26
4-12
Electrical Connections ............................................................................28
4-13
Initial Set Up ...........................................................................................28
4-14
Ship Loose Items ....................................................................................29
Chapter 5:
Remote Air Cooled Condenser – Installation ................................................... 32
5-1
Location .................................................................................................32
5-2
Lifting Remote Condensers ....................................................................34
5-3
Remote Air-Cooled Chiller Condensers ..................................................35
5-4
Interconnecting Refrigerant Piping..........................................................36
5-5
System Configuration .............................................................................36
Remote Air-Cooled Chiller Configurations .....................................................................37
5-6
Sizing Refrigerant Lines .........................................................................39
Liquid Line Sizing .................................................................................... 39
Discharge Line Sizing ............................................................................. 39
5-7
Pressure drop Equivalent Pipe Length (Feet) .........................................39
5-8
Liquid Line Sizing ...................................................................................40
5-9
Discharge Line Sizing .............................................................................41
5-10
Refrigerant Charge Determination ..........................................................42
5-11
Refrigerant Charge Determination ..........................................................42
5-12
Oil Charge Determination .......................................................................43
Chapter 6:
General Operation Overview ............................................................................. 44
6-1
HMI Buttons, Indicator Lights, and Switches ...........................................44
6-2
Finishing Setup: Password Protection ....................................................44
6-3
Initial Start-Up /Setting Tank Temperature Setpoint ................................46
Содержание HE Series
Страница 22: ...HE Series Central Chillers 882 03862 00 12 02 2021 22 Fork Lift...
Страница 30: ...HE Series Central Chillers 882 03862 00 12 02 2021 30...
Страница 31: ...HE Series Central Chillers 882 03862 00 12 02 2021 31...
Страница 33: ...HE Series Central Chillers 882 03862 00 12 02 2021 33...
Страница 57: ...HE Series Central Chillers Chapter 6 57 of 83...
Страница 60: ...HE Series Central Chillers Chapter 7 60 of 83 Updating a C pCO s Program Using a USB Stick...
Страница 61: ...HE Series Central Chillers Chapter 7 61 of 83 Saving or Restoring Settings to a USB Stick...
Страница 62: ...HE Series Central Chillers Chapter 7 62 of 83 Updating an Exor HMI Program using a USB Stick...
Страница 63: ...HE Series Central Chillers Chapter 7 63 of 83 Downloading Alarm History to a USB Stick...
Страница 64: ...HE Series Central Chillers Chapter 7 64 of 83 Downloading Chiller Logs to a USB Stick...
Страница 65: ...HE Series Central Chillers Chapter 7 65 of 83 Changing the Exor IP Address...
Страница 75: ...HE Series Central Chillers Chapter 10 75 of 83 10 2 Piping Schematic for Remote Cooled Chiller...
Страница 76: ...HE Series Central Chillers Chapter 10 76 of 83...