background image

 

 

 

SAT 

 

page 6 of 9 

 

 

Repair

 

 

A repair may only be carried out by the manufacturer.  

 

If the device must be sent back for repair, the following informations must be enclosed: 

 

An exact description of the application. 

 

The chemical and physical characteristics of the product. 

 

A short description of the occurred error. 

 

Before returning the device for repair, the following measures must be proceeded: 

 

All stick product residues must be removed. This is especially important, if the product is unhealthily, 
e.g. caustic, toxic, carcinogenic, radioactive etc.

 

 

A returning must be refrained, if it is not possible by 100% to remove the unhealthily product 
completely, because e.g. it is penetrate into cracks or is diffused through plastic.

 

 

 

Electrical connection

 

 

The electrical connection of the device must be carried out according to the respective country specific 
standards. Incorrect installation or adjustment could cause applicationally conditioned risks. 

 

Use only suitable cables with max. 25 

 per wire, that fulfills the requirements e.g. regarding temperature, 

resistance or laying at the place of installation. 

 

The cable gland is suitable for cable diameters from 3,5 to 8 mm. After installation of the cable the cable gland 
must be fix screwed to ensure the tightness of the connection housing. 

 

Use only shielded signal and measurement wires and install these wires separated from power leading wires. 
At strong electromagnetic irradiation use principally a cable with shield. Connect the cable shield only at one 
side to earth. 

 

A suitable evaluation device must by connected by the connection cable with the electrode rods inside the 
connection housing. 
The connection of the cable to the electrode rods is made by terminals for wire cross-cuts up to 2,5 mm

2

 or by 

screw connections inside the connection housing. For the connection use isolated thimbles. 

 

At electrode probes an additional module (diode module LBM) for the wire supervision can be installed inside 
the housing. This must always be connected between the shortest rod and the longest rod. 
A connection polarity is not relevant. When using evaluation devices resp. transmitter, that does not support a 
wire supervision, this module may not be installed. 

 

For inauguration it is suggested to switch off all connected control devices to avoid unintended control actions. 

 
 
 
 

 

 

Two-position-control 

 

For a two-position-control, an electrode probe with three  

 

rods must be used, where the longest rod represents the  

 

reference electrode.  

 

  

 

The evaluation device with a function for two-position-control keeps the  

 

filling material level between the upper and the lower limit level. 

 

 

  

 
 

Four-level-detection 

 

For a four-level-detection an electrode probe with five rods must be  

 

 used, where the longest rod represents the reference electrode.  

 

 

 

For the evaluation two two-channel-evaluation-devices are used, 
whose both reference connection must be connected with the longest 
electrode.

 

Содержание SAT

Страница 1: ...position control of pumps Wide application range for conductivities higher than 1 S cm for process temperatures from 15 C to 150 C for process pressures from 1 bar to 10 bar materials also for aggres...

Страница 2: ...SAT page 2 of 9 Index Application field 3 Function 3 Safety notes 3 Installation 4 Maintenance 4 Repair 5 Electrical connection 5...

Страница 3: ...trode probe is mounted directly in the wall of the container or of the pipe by using the respective process connection or installed over the filling material by using a suitable mount The alternating...

Страница 4: ...ce is installed and operated in explosive hazardous areas the general Ex construction standards EN IEC 60079 14 VDE 0165 these safety notes and the enclosed EC conformity certificate must be observed...

Страница 5: ...y if the filling material is strongly fluctuating Use for the stabilization suitable isolating spacers The distance between the spaces should be not more than 0 5 m At horizontal side mounting into a...

Страница 6: ...parated from power leading wires At strong electromagnetic irradiation use principally a cable with shield Connect the cable shield only at one side to earth A suitable evaluation device must by conne...

Страница 7: ...5 C Limitation by material Environmental temperature range Terminal enclosure PP 5 100 C Process temperature maximum 15 C 150 C observe limitations Limitation by variant Process temperature range ATEX...

Страница 8: ...rocess connection G15 G 1 Process connection G20 G 2 Process connection G10 G 1 Process connection G12 G Terminal enclosure 60mm only with material POM Terminal enclosure 40mm with terminal enclosure...

Страница 9: ...others on request Material process connection terminal enclosure D POM 40mm for G G 1 resp 80mm for G 1 G 2 E POM 60mm for G G 1 P PP 40mm for process connection G G 1 M PP 80mm for process connection...