background image

INSTALLATION, OPERATION

& MAINTENANCE MANUAL

NEO-METRO FIELD SERVICE

TOLL FREE

LOCAL

FAX

800-743-8259 •

626-855-4866 •

626-855-4863

Date: 01/31/22

Part #: 0696-001-001

Page

of 4

2

REMOVE SHOWER BASE CAREFULLY

FROM PACKAGING

REMOVE PACKAGING
WITH CARE

ACORN

AVOID STANDING
BASE ON EDGES

1

Carefully remove

from packaging prior to

installation. Inspect for any damage. Avoid
placing

on its edges; this precaution will

prevent damage to corners.

Base

Base

HANDLING

2

Level

carefully. For proper installation,

establish a 1/4” maximum clearance between
the

and the walls. Place up to ½” of

Mortar or Thinset and screed in area where the

Base

Base

Base

is to be installed. This procedure is

recommended in order to support the
should the Sub-Floor be uneven. Taper the
Mortar/Thinset to a 1/4” thickness around the
Drain Floor. DO NOT place Mortar/Thinset
closer than 2” from the edge of the

or the

Floor Drain opening.

Base

Base

LEVELING

3

WARNING!

DO NOT DROP BASE OVER EXPOSED PIPE

It is advisable to remove Drain Pipe prior to
setting

in place. Insert Pipe through

Drain in

into P-Trap. Tighten with an

Internal Pipe Wrench.

Base

Base

THINSET OR
MORTAR BED

SUB-FLOOR

DOTTED AREA IS

FOR CORTERRA BASE

REMOVE PIPE
FROM P-TRAP

RE-INSERT PIPE AND TIGHTEN

WITH AN INTERNAL WRENCH

RECOMMENDED

1/4” SPACE

1/4" MAX.

EXPANSION GAP

Отзывы: