INSTALLATION, OPERATION
& MAINTENANCE MANUAL
NEO-METRO FIELD SERVICE
TOLL FREE
LOCAL
FAX
800-743-8259 •
626-855-4866 •
626-855-4863
Date: 01/31/22
Part #: 0696-001-001
Page
of 4
4
1. Allow the Rough Wall material with a gap of
approximately 1/2” (Do not allow Rough
Wall Material to overlap Tiling Flange)
2. Let Finished Wall (Tile, etc.) overlap and
rest on shoulder.
RECOMMENDED INSTALLATION FOR
MODEL WITH TILING FLANGE OPTIONS:
NOTE:
Neo-Metro assumes no responsibility
for problems due to faulty installation or
inadequate floor support.
1
1
1
1
5
STEP 1:
1
2
"
1
2
"
LATH / PLASTER
BOARD, ETC.
MATERIAL (Tile, etc.)
FINISHED WALL
STEP 2:
DO NOT NAIL OR SCREW
FLANGE TO WALL