Step 1: Determination of Installation Location and Heat-dissipation Space
Determination of installation location: The controller shall be installed in a place
with sufficient air flow through the radiators of the controller and a minimum
clearance of 150 mm from the upper and lower edges of the controller to ensure
natural thermal convection. Please see Figure 2-1: Mounting
CAUTION: If the controller is to be installed in an enclosed box, it is
important to ensure reliable heat dissipation through the box.
Figure 2-2 Schematic of wiring diagram
Step 2
:
Connect the system in the order of
battery
load
PV array
in accordance with Figure 2-2,”Schematic Wiring Diagram” and disconnect the
system in the reverse order
.
1
1
1
2
2
2
3
3
3
CAUTION:
While wiring the controller do not close the circuit breaker or
fuse and make sure that the leads of "+" and "-" poles are connected
correctly.
CAUTION:
A fuse which current is 1.25 to 2 times the rated current of the
controller, must be installed on the battery side with a distance from the
battery not greater than 150 mm.
CAUTION:
If the controller is to be used in an area with frequent lightning
strikes or unattended area, it must install an external surge arrester.
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Содержание Midas Y Series
Страница 11: ...Installation Procedure Mounting Instruction Figure 2 1 Mounting 150mm 150mm 150mm 150mm 08...
Страница 37: ...Annex II Mechanical Dimension Diagra MY20 Unit mm 149 217 28 5 160 56 5 7 5 R2 5 158 34...
Страница 38: ...MY30 Unit mm 156 230 28 5 173 63 7 5 R2 5 165 35...
Страница 39: ...MY40 Unit mm 176 255 27 5 200 67 8 7 5 R2 5 185 36...
Страница 40: ...Add 4120 Valley Blvd Walnut CA 91789 USA Tel 1 626 575 7722 Email sales acopower com Web www acopower com...