11
Operation manual
ACO Clara
5
Installation
Before handling it is necessary to ensure the
plant spaces are free of foreign objects and
stormwater and that the cordings on the plant
are sufficiently tight.
The plant can be transported only on a truck with sufficient carrying
capacity and sufficient freight space dimensions. The handling can be
performed using crane. It is necessary to use a beam hanger.
Always handle in a horizontal position with a view to the
strength of the materials used.
For temporary storage of the waste water treatment plant
it is necessary to provide a flat surface with the ground
area of the plant as a minimum area and under conditions
that prevent any mechanical damage.
During long-term storage the plant must not be exposed to solar radiati-
on for longer than 3 months.
5.1
Transport and storage
!
!
!
No handling of the plant should take place
below a temperature of +5°C.
For manipulation with unit always use
a beam hanger.
L
Depending on the location of the blower, it is necessary to ensure a pas-
sage for the hose regarding the power supply to the box for the blower.
A 7-m hose is a part of supply.
It is recommended to run the hose underground at a depth suitable for
connection to the plant. The hose must be protected against ground
pressure; it must not be pressed down or broken (connect this hose to
the pipe sleeve).
During the preparation for installation it is necessary to provide either a
power supply to the blower or a passage for the inlet hose, depending
on the location of the blower.
The blower should be situated up to 7 m from the plant. In the event of a
greater distance please contact the manufacturer.
5.2
Installation of blower
The air supplied to the plant by the blower must be ventilated to an out-
door space. The ventilation is provided by the ventilation pipe DN 100,
which must be opened above ground.
The ventilation pipe must terminate at a sufficient height
above ground for it to be above snow level during
the winter period.
In some cases the plant can be ventilated by inlet or outlet pipes. Then
the ventilation pipe can remain unused.
5.3
Plant ventilation
The construction work must be performed as a project of an authorized
design organization.
A supply of service water in a minimum quantity corresponding with the
operating volume of the plant volume and an adequate handling area
must be provided during installation.
During the operation of the plant a handling area of at least 1m must be
provided around the plant.
A traffic load and any other load on the
surroundings of the plant are allowed at
a distance of 3 m from the tank wall.
Both the plant covers and the ground above the plant itself can bear a
load of up to a maximum of 2,5 kN/m
2
.
5.4
Construction requirements
!
ACO Clara 19-38
24-48
30-60
38-76
48-96
60-120
L [mm]
1810
2050
2050
2200
2390
2800
in object
in plastic box
Blower location:
Содержание ClarA 19-38
Страница 1: ...Waste water treatment plant ACO ClarA 19 38 24 48 30 60 38 76 48 96 60 100 Operation manual ...
Страница 28: ...28 Operation manual ACO Clara F2 F1 OFF O 0 OFF A C D B ...
Страница 29: ...29 Operation manual ACO Clara 3000 h 27 5mm DT 4 25 No 27 5mm 28mm DT 4 40 No 28mm xxxx H E F G ...
Страница 32: ...32 Operation manual ACO Clara p VACUUM p PRESSURE OFF O 0 OFF A C 1 C 2 B ...
Страница 33: ...33 Operation manual ACO Clara No D H XXXXX F D 1 D 2 E ...
Страница 36: ...36 Operation manual ACO Clara PRESSURE p p VACUUM OFF O 0 OFF A C 1 C 2 B ...
Страница 37: ...37 Operation manual ACO Clara D 75 mm H 170 mm No 909568 No D xxxx H p VACUUM PRESSURE p F D 1 D 2 E ...