![ACO Haustechnik ACO Quatrix-K 620368 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/aco-haustechnik/aco-quatrix-k-620368/aco-quatrix-k-620368_installation-information_459527019.webp)
19
Subject to technical alterations
ACO Haustechnik
0 1 7 3 . 0 2 . 5 9 G
1.
After initial connection and depending on loading condition of bat-
tery, entire operational capability is reached only after 24 hours of
mains operation.
2.
Behaviour in the case of battery fault
Establish mains connection and wait. Battery faults always occur
with insufficient charging condition of the battery or with a damaged
battery fuse.
Caution!
3.
Behaviour in the case of motor fault
Check motor fuse and supply or connecting cable for damages. If
required, start initialisation by double-pressing button (5). Check
motor spindle by de-assembling the housing cover (spindle break).
In this case, contact fitter / specialist contractor.
7
Operation
8
Servicing
Caution!
No warranty claims accepted in the case of insufficient servicing!
The anti-flood protection system must be visually checked once a
month by the operator or an authorised person. For this, the valve flap
is opened and closed by pressing the test button. In addition, the emer-
gency seal lever is closed and re-opened several times manually.
At the end, both flaps must be open.
The anti-flood protection system must be serviced at least twice a year
by a specialist contractor. During servicing, no wastewater must be fed
to the anti-flood protection system.
Close valve and emergency seal before cover is removed.
Valve flap: press test button once.
Emergency seal flap: position 3 (para 2.8 on page 7).
Caution!
Following actions have to be carried out:
Fig. 44
Loosen six cap nuts and remove cover care- fully.
Remove valve flap and emergency seal flap.
Fig. 45