DoUbLE RoLLER PUMP foR LAPARoScoPY
Ackermann
Page: 14 // 18
12.2. CHeCkIng THe floW raTe
For this test you will need:
• The device
• New tube set
• 3,5 liter measuring beaker with scale (A)
• Water reservoir with 3,0 liters of water (B)
• Manual control/double footswitch
• Adapter duct with cannula connected
• A watch that displays seconds, or a stopwatch
The suction and irrigation flow rate test procedure is carried out in the following steps:
1. Plug the AC plug into an AC outlet and switch on the device using the AC power switch. The STANDBY LED light yellow.
2. Connect the pneumatic control (manual control I double footswitch) to the device. Ensure that the connection is tight
and there are no leaks.
3. Activate the device by pressing the push button ON/OFF.
4. The device performs a self test.
5. Now install the tube set.
6. Immerse the end of the supply tube in the water reservoir (B) and the end of the tube section for the fluid collection
receptacle in the measuring beaker (A). The ends must be positioned to lie on the bottom of the receptacle.
7. Start the device by pressing the push button START/STOP. The START LED light green.
8. Point the cannula of the adapter duct into the measuring beaker (A) and press the blue button on the manual control /
the left footswitch on the double footswitch. The irrigation procedure is activated.
9. Pump fluid until fluid exits from the end of the tube in the measuring beaker (A). Continue to pump until there is approx.
300 ml water in the measuring beaker. Stop the irrigation procedure by pressuring the push button START/STOP. The
STOP LED light yellow.
1 0. Immerse the distal end of the cannula in the collected water in the measuring beaker (A). Press the red button on the
manual control / the right footswitch on the double footswitch to suck back up approx. threequarters of the contents. The
entire tube system is now filled with water.
11 . Return the water collected in the measuring beaker (A) back to the water reservoir (B). Then have the watch ready for
measuring the exact time that elapses.
1 2. Start the irrigation process by pressing and holding down the blue button on the manual control / left footswitch on the
double footswitch for exactly 1 minute at maximum flow. At the end of this time, there must be 3,0 liters of water (-15 % to
+5 %) in the measuring beaker (A).
1 3. Now start the suction process by pressing the red button on the manual control / the left footswitch on the double
footswitch. Now, also at maximum power, pump (suction) the water out of the container again. At the end of this time, the
measuring beaker must be pumped practically empty.
If the amount of liquid pumped is outside (greater or less than) the tolerances, repeat the procedures. If the second attempt
also fails, please contact your authorized service partner.
Setup of flow rate test:
Содержание 16-2080
Страница 17: ...Ackermann Page 17 18 SHAVER SYSTEM ...