12
2.When turned on, high-temperature heating zone cannot be any direct contact with the
object , because it may cause fire or explosion ,and the PCB work piece should be
placed on the PCB support shelves.
3. Do not shake BGA rework station, and move gently.
4. Do not touch the high fever area to avoid get burned.
5. When turned on, do not use the flammable spray, liquid or flammable gas near the
repair station.
6. Do not try to modify BGA rework station when in power , otherwise it will cause fire or
electric shock.
7. Electrical box has the high-voltage components, do not attempt to disassemble it.
8. If the metal objects or liquids fall into the repair station when it works , immediately
disconnect the power , unplug the power cord until the machine to cool down , then
completely remove litter , dirt ; if dirt left ,there is odor when reboot.
9. When abnormal heating or smoking immediately disconnect the power , and inform the
technical service to repair. It needs to disconnect the wires between the electrical boxes
and machine parts, and have to hold the plug, otherwise it leads to poor contact ,and does
not work.
10. Note that the repair station not to press or run over other electrical equipment or power
lines or communication cable , and it may cause device malfunction or cause fire or
electric shock.
ACHI IR12000 touch screen use:
Operation steps:
1. Power on to turn on the ACHI IR12000 BGA rework station
Содержание IR12000
Страница 3: ...3 ...
Страница 13: ...13 2 The touch screen shows interface as below you can select your target language ...
Страница 14: ...14 3 Choose English turn up below interface ...
Страница 15: ...15 4 After input password below interface shows ...
Страница 17: ...17 6 Click and Click to run the current selected temperature profile ...