83
Configuring server management
components
Altos R920 system provides an upgrade path to advanced server
management capabilities through installation of the following
components.
•
I/O expansion module
•
ARMC/3 R2 module
Installing and removing the I/O expansion module
The optional I/O expansion module is a vertical riser with a dedicated
management Ethernet port, and additional dual-gigabit Ethernet
ports.
To install the I/O expansion module:
1
Perform the pre-installation instructions described on page 39.
2
Rotate the retention latch on the rear of the card slot upward
(A)
.
3
Pull up the slot cover
(B)
.
4
Remove the board from its protective packaging.
5
Align the board in the empty slot
(C)
.
Содержание Altos R920 Series
Страница 1: ...Acer Altos R920 Series User s Guide ...
Страница 18: ...xviii SAS configuration utility 180 SAS RAID configuration utility 182 Index 185 ...
Страница 19: ...1 System tour ...
Страница 47: ...2 System setup ...
Страница 55: ...3 System upgrade ...
Страница 60: ...3 System upgrade 42 To install the front bezel Slide the front bezel onto the chassis ...
Страница 115: ...4 System BIOS ...
Страница 145: ...127 System Information The System Information submenu displays basic information about the server unit ...
Страница 153: ...5 System troubleshooting ...
Страница 166: ...5 System troubleshooting 148 ...
Страница 167: ...Appendix A Rack mount configuration ...
Страница 168: ...This appendix shows you how to set up the Altos R920 system in a rack mount configuration ...
Страница 176: ...Appendix A Rack mount configuration 158 6 Fully extend the mounting rails on the rack ...
Страница 180: ...Appendix A Rack mount configuration 162 ...
Страница 181: ...Appendix B Memory configuration ...
Страница 195: ...Appendix C SAS and SAS RAID configuration utilities ...
Страница 196: ...This appendix gives an overview of the RAID configuration utilities supported by your server ...
Страница 202: ...Appendix C SAS and SAS RAID configuration utilities 184 ...
Страница 206: ...188 ...