Getting Started
Suggested Tools For Installation (Not Included)
Phillips
Screwdriver
Scissors
or Knife
Pencil
Level
Ruler or Tape
Measure
Heavy object. Team handling is required during the installation process.
Carefully remove all the packaging straps and wraps from the air conditioner and accesso-
ries.
CAUTION
Removing All the Packaging
Left curtain frame
pre-assembled in factory.
Left curtain,
pre-assembled in factory.
Top channel,
pre-assembled in factory.
Right curtain frame,
pre-assembled in factory.
Right curtain,
pre-assembled in factory.
Bottom channel,
pre-assembled in factory.
L
R
Your home in sync
13