background image

 

 

4

 

Installation 

The  installation  must  only be done by a company  that  is  familiar with  bodybuilding or  modifying 
vehicles, and that have the trained technical staff. 

4.1

 

Mechanical Installation 

 
 
 
 
 
 
 

 

 

Note:

 It is needed to open and close the 

step during the installation, therefore you 
should either first install the electrical system 
as described under 7.2 or you can open and 
close the step by putting direct 12V power 
on the 2 pin AMP super seal connector 
coming from the motor orange and yellow 
cables as shown below. Reverse polarity for 
reversing the direction of rotation. See also: 
schedule at section 10.

 

If you decide to hotwire the 
electric motor to open or 
close the step: make sure 
you disconnect it 
immediately after the step 
reaches the most inward or 
outward position. 

The burning of the electric 
motor due to hotwiring 

doesn’t fall under 

warranty! 

Step 1:

  Create a safe working 

environment. Raise the vehicle to an 
convenient working height.

 

Fig 1 shows the basic principles for 
affixing the step. Note that the motor 
swing assembly can be placed in the 
front or in the rear (Fig 2). This has no 
influence at the function of the step.

 

 

Figure

 1

 

Make sure that the step is not too 
close to hot parts such as the 
exhaust system. This can 
damage the step. Recommended 
min distance = 5 cm

 

2x 

Содержание VERSA SL Step

Страница 1: ...Condensed Manual ACDEOS BV Touwbaan 1A 2352 CZ Leiderdorp Netherlands WWW ACDEOS COM Date Jan 2022 ver 3 VERSASLStep...

Страница 2: ...oad 250 Kg 2500 N Materials Frame steel plate work High temp zinc corrosion protected Step Aluminum profile and ABS corner covers Life cycle Tested life cycle of the step is 250 000 cycles Electrical...

Страница 3: ...ep when they are operating it 5 It is recommended that the middle of the platform is used when stepping onto the step 6 NEVER drive away when the RED dashboard LED light is still on this means that th...

Страница 4: ...e dashboard LED and buzzer change from slow blinking mode in fast blinking mode indicating step is not out 3 2 Stow operation procedure To stow the step the door should be closed or the driver has to...

Страница 5: ...sing the direction of rotation See also schedule at section 10 If you decide to hotwire the electric motor to open or close the step make sure you disconnect it immediately after the step reaches the...

Страница 6: ...g bolts Fig 6 The holes for this attachment should be located on the lower flange of the outer chassis bar of the vehicle Figure 13 M8 Step 7 Take the 4 flexible mounting brackets supplied with the st...

Страница 7: ...hat it sticks out as far as possible not exceeding 1 cm outward of the footprint of the vehicle Step 11 Electrically open the step and check if both swing arms lock in final position If one swing arm...

Страница 8: ...I There are two possible operations of the step 1 Door switch The step moves out automatically when the door opens 2 Driver operated switch on the dashboard which the driver operates the step with In...

Страница 9: ...x seal with a bit of PU glue 6 Place the magnet on the opposite position on the door Drill a hole of 6 5 mm and push in the black magnet holder with magnet We recommend using the plastic holder but yo...

Страница 10: ...Connect the black wire to ground Connect the red wire to 12V power You have to add a fuse of 20 Amp between the battery and the power cable Decide whether to connect the step to constant power or to p...

Страница 11: ...being sprinkled on the road it should be cleaned more regularly Normal non aggressive cleaning materials as used for cleaning the other parts of the vehicle should be used it is not recommended to us...

Страница 12: ...cal connections for possible failures Clean all parts In Principle the PTFE bearings are maintenance free If there is some moving noise Grease moving parts with MOTIP White PTFE grease We strongly rec...

Страница 13: ...A City 2352 CZ Leiderdorp Country Netherlands Website WWW ACDEOS COM Legal represented by Mr A de Moes Conformity Product is designed tested and produced confirm The loading recommendations in the Mac...

Страница 14: ...14 7 Appendix 1 electric schedule...

Страница 15: ...15 8 Appendix 2 Installation drawings AXS SWSS 1000 1200...

Страница 16: ...16 ACDEOS BV Touwbaan 1A 2352 CZ Leiderdorp The Netherlands 31 71 5891819 Info acdeos com www ACDEOS com...

Отзывы: