background image

 

10 

The distance between the end of the switch and the door should still be 8.5 mm.

 

IMPORTANT: 

Max torque to fit the switch is 5 Nm (This is light hand tight)

 

If you use higher torque, the 

switch will break / crack, which will lead to unreliable door signals.   

 
 
 
 
 
 
 
 

 

9.

 

Place the red LED in the dashboard in the direct view of the driver. Connect the red wire coming 
from the LED to the 12 V power. The LED should light up red when the step is in outward and 
flashes when the step is moving in or out. 

 
 
 
 
 
 
 
 
 

10.

 

Connect the black wire to ground. Connect the red wire to 12V 
power. 

You have to add a fuse of 20 Amp

 between the battery 

and the power cable. Decide whether to connect the step to 
constant power or to power behind the main switch. We 
recommend placing the step behind the main switch. The step 
ECU has a sleep mode using less than 1 mAmp in standby 
mode. 

11.

 

 

 

 

 

 

 

 
 
 
 
 

 

If you decide to use driver operation, place a switch on the dashboard 
and connect it to the Green wire. Closed signal => step out. Open 

signal => step stowed. To prevent oversight from the driver’s point, also 

install the door switch to prevent driving with the step in outward 
position.

 

Connect the cable loom to the step 
with the connectors.

 

Содержание VERSA SL Step

Страница 1: ...Condensed Manual ACDEOS BV Touwbaan 1A 2352 CZ Leiderdorp Netherlands WWW ACDEOS COM Date Jan 2022 ver 3 VERSASLStep...

Страница 2: ...oad 250 Kg 2500 N Materials Frame steel plate work High temp zinc corrosion protected Step Aluminum profile and ABS corner covers Life cycle Tested life cycle of the step is 250 000 cycles Electrical...

Страница 3: ...ep when they are operating it 5 It is recommended that the middle of the platform is used when stepping onto the step 6 NEVER drive away when the RED dashboard LED light is still on this means that th...

Страница 4: ...e dashboard LED and buzzer change from slow blinking mode in fast blinking mode indicating step is not out 3 2 Stow operation procedure To stow the step the door should be closed or the driver has to...

Страница 5: ...sing the direction of rotation See also schedule at section 10 If you decide to hotwire the electric motor to open or close the step make sure you disconnect it immediately after the step reaches the...

Страница 6: ...g bolts Fig 6 The holes for this attachment should be located on the lower flange of the outer chassis bar of the vehicle Figure 13 M8 Step 7 Take the 4 flexible mounting brackets supplied with the st...

Страница 7: ...hat it sticks out as far as possible not exceeding 1 cm outward of the footprint of the vehicle Step 11 Electrically open the step and check if both swing arms lock in final position If one swing arm...

Страница 8: ...I There are two possible operations of the step 1 Door switch The step moves out automatically when the door opens 2 Driver operated switch on the dashboard which the driver operates the step with In...

Страница 9: ...x seal with a bit of PU glue 6 Place the magnet on the opposite position on the door Drill a hole of 6 5 mm and push in the black magnet holder with magnet We recommend using the plastic holder but yo...

Страница 10: ...Connect the black wire to ground Connect the red wire to 12V power You have to add a fuse of 20 Amp between the battery and the power cable Decide whether to connect the step to constant power or to p...

Страница 11: ...being sprinkled on the road it should be cleaned more regularly Normal non aggressive cleaning materials as used for cleaning the other parts of the vehicle should be used it is not recommended to us...

Страница 12: ...cal connections for possible failures Clean all parts In Principle the PTFE bearings are maintenance free If there is some moving noise Grease moving parts with MOTIP White PTFE grease We strongly rec...

Страница 13: ...A City 2352 CZ Leiderdorp Country Netherlands Website WWW ACDEOS COM Legal represented by Mr A de Moes Conformity Product is designed tested and produced confirm The loading recommendations in the Mac...

Страница 14: ...14 7 Appendix 1 electric schedule...

Страница 15: ...15 8 Appendix 2 Installation drawings AXS SWSS 1000 1200...

Страница 16: ...16 ACDEOS BV Touwbaan 1A 2352 CZ Leiderdorp The Netherlands 31 71 5891819 Info acdeos com www ACDEOS com...

Отзывы: