page 15
LEGEND OF THE COMPONENTS
W version for wall installation
1 Front panel
2 Angular panel
3 Left panel
4 Air filter
5 Filter attachment knob
6 Casing crossbar
7 Adjustable grille blades
8 Right support for blades
9 Left support for blades
10 Rubber gasket for blades
11 Grille left support
12 Grille right support
13 Middle support for blades
14 Fan injector
15 Fan scroll
16 Fan support
17 Fan motor cradle
18 Fan motor
19 Fan motor attachment U-bolt
20 Centrifugal fan
21 Fan motor capacitor
22 Control panel
23 Control panel support
24 Control panel fastening bracket
25 Pressure switch tubes
26 Burner control device
27 Printed electric circuit
28 Electrical board support
29 Pressure switch
30 RFI filter
31 Exchanger left support
32 Fan left support
33 Exchanger right support
34 Fan right support
35 Heat exchanger
36 Exchanger gaskets
37 Exchanger insulating gasket
38 Fan thermostat
39 Agitator
40 Flue gas expeller gasket
41 Flue gas expeller
42 Combustion chamber door
43 Door gasket
44 Combustion chamber
45 Burner
46 Burner bracket
47 Exchanger/combustion chamber gasket
48 Back plate/combustion chamber gasket
49 Electrodes
50 Gas injector
51 Intake gasket
52 Intake connector
53 Gas supply pipe
54 Gas pipe gasket
55 Gas solenoid valve
56 Attachment plate
57 Bushings
58 Back plate
59 Safety thermostat protection
60 Safety thermostat
61 Safety thermostat electric terminal board
62 Terminals
63 Exhaust flue
64 Intake duct
65 Exhaust connector
66 Exhaust gasket
67 Valve rectifier bridge
page 22
grille must be applied, which is supplied on request
(fig. 16).
4.4 INSTALLATION OPERATIONS
Set up the gas and electricity supply lines based
on the installation design.
4.4.1 Air heater mounting preparations
Versions for ceiling installation (WR and
WD): Once the unit’s position has been
determined, bend the supplied paper template
on the dashed line and apply it to the ceiling
with adhesive tape (fig. 17).
a) Indicate the position of the four holes to be
made for installing the unit by means of screw
anchors or another system that is suitable
for the type of structure.
b) On the wall indicate the position of the two
holes that must go through the wall for the
exhaust and intake ducts. These holes must
be made as perpendicular as possible to the
wall with a core drill having a diameter of 70
mm (fig. 17).
The positions for the electric power supply
cable entrance and the gas delivery tube are
also shown on the template. They can be
brought to these positions depending on the
type of system chosen.
c) Cut a section of aluminum pipe with a
diameter of 70 mm that is equal to the
thickness of the wall. These segments must
then be installed in the wall as a sheath for
the ducts.
d) Use the following procedure to remove the
right angular panel of the air heater casing:
First remove the two fastening screws on the
front. Then use the tip of the screwdriver as
a lever to free the fastening springs on the
rear. Free the left panel’s fastening springs
in the same way, by pulling sideways until
they are released.
Version for wall installation (W): Once the
unit’s position has been determined, bend the
supplied paper template on the dashed line and
apply it to the wall with adhesive tape (fig.18)
a) Indicate the position of the holes to be made
(Four holes for installing the unit by means
of screw anchors, and two holes that go
through the wall for the exhaust and intake
ducts. These holes must be made as
perpendicular as possible to the wall with a
core drill having a diameter of 70 mm).
The positions for the electric power supply
cable entrance and the gas delivery tube are
Fig. 16
TERMINAL PROTECTION GRILLE
Grille
Fig. 17
PREPARATIONS FOR INSTALLING THE AIR HEATER - WR and WD versions for installation on the ceiling
Содержание W
Страница 2: ......