background image

page 13

LEGEND OF THE COMPONENTS
WD version with ducts for ceiling installation

1 Bottom panel
2 Angular panel
3 Left panel
4 Air delivery frame
5 Air intake frame
6 Fan injector
7 Fan scroll
8 Fan support
9 Fan motor cradle

10 Fan motor
11 Fan motor attachment U-bolt
12 Centrifugal fan
13 Fan motor capacitor
14 Remote-control panel
15 Door to the controls (not used)
16 Pressure switch tubes
17 Burner control device
18 Printed electric circuit
19 Electrical board support
20 Pressure switch
21 RFI filter
22 Exchanger left support
23 Fan left support
24 Exchanger right support
25 Fan right support
26 Heat exchanger
27 Exchanger gaskets
28 Exchanger insulating gasket
29 Fan thermostat
30 Turbulator

31 Flue gas expeller gasket
32 Flue gas expeller
33 Combustion chamber door
34 Door gasket
35 Combustion chamber
36 Burner
37 Burner bracket
38 Exchanger/combustion chamber gasket
39 Back plate/combustion chamber gasket
40 Electrodes
41 Gas injector
42 Intake gasket
43 Inner intake connector
44 Inner intake duct
45 Inner exhaust flue
46 Gas supply pipe
47 Gas pipe gasket
48 Gas solenoid valve
49 Attachment plate
50 Bushings
51 Back plate
52 Safety thermostat protection
53 Safety thermostat
54 Safety thermostat electric terminal board
55 Clamps for holding the ducts
56 Terminals
57 Exhaust flue
58 Intake duct

59 Valve rectifier bridge

page 24

thick. If your walls are thicker, ducts that are 100
cm long are available on request.

Mount the duct according to the procedure
described below:

a) Precisely measure the thickness of the wall

where the ducts are to pass through.

b) If necessary, cut a piece off both ducts whose

length is the difference between 40 cm and
the effective thickness of the wall (fig. 20).
Any cuts must be made on the ends opposite
the connection flanges. Make sure that they
are cut squarely and trim off any burrs. NOTE:
The exhaust flue is the longer of the two.
It sticks out compared to the connection
flange.

c) Use the provided screws to attach the ducts

to the connectors on the unit’s rear. Make
sure to place the gaskets on the duct flanges.

d) Check that the flue gas exhaust pipe is

correctly inserted in the flue gas expeller fan
scroll and fasten it in place with the supplied
self-drilling screw.

4.4.3 Mounting the unit

Versions for ceiling installation (WR and WD)

WARNING! For your safety, due to the weight
of the unit and the possible difficulties of
installing it, it is advisable to use a mechanical
hoisting device for positioning the air heater.
For these same reasons and also to avoid
damaging the unit itself, it is necessary for it
to be put into place by two people.

a) Use suitable means to raise the air heater to

its position and align the four fastening holes.

Tighten the anchoring points so that they are
safe and stable.

b) Place the exhaust and intake ducts near the

connectors on the unit until they are aligned.
Adjust the position of the metal connection
clamps with their gaskets. Tighten the clamps’
fastening screws and make sure that they
are correctly sealed.

c) Check that the outside terminals are in the

correct corresponding position (fig. 19) and
touch up the plastering around the holes
through which the ducts pass..

Version for wall installation (W)

WARNING! It is advisable to use two people
to raise the air heater and put it into position
so as to avoid any possible damage to the
wall or the unit.

a) Raise the air heater, insert the ducts in the

holes, and carefully push it towards the wall
until it comes into contact with it.

b) Adjust the position of the unit and attach it

with the screws to the screw anchors that
were previously inserted in the wall. If the wall
is not perfectly straight, use spacers at the
points where the attachments are to be made.

c) Check that the outside terminals are in the

correct corresponding position (fig. 20) and
touch up the plastering around the holes
through which the ducts pass. Attach the wind
protection terminals to the outside ends of
the ducts by completely inserting them in
place and attaching them to the ducts by
means of the supplied self-drilling screws.

4.4.4 Gas connection

IMPORTANT! It is necessary to mount a gas
on-off valve upline from the unit. The valve
must be located in a position that can be
easily accessed by the user.

Connect the gas supply line to the air heater
which is equipped with a G 1/2”A male threaded
connector.

Check the seal on the gas piping and make sure
that it is in conformity with the current regulations
regarding gas systems.

4.4.5 Electrical connections

Ensure that a single-phase, 230 V, ~ 50 Hz
electric power supply is available.

The electrical system must be properly
isolated by means of an omnipolar circuit
breaker, whose contacts open by at least 3

Fig. 20

Intake terminal

10 cm

2 cm

Exhaust

terminal

EXHAUST AND INTAKE DUCTS

W version for installation on the wall

Содержание W

Страница 1: ...A2B srl Via d Ancona 37 60027 Osimo An Tel 071 723991 Fax 071 7133153 Web Site www accorroni it E mail a2b a 2 b it Technical information W WR WD Gas fired convection heaters with fan W WR WD...

Страница 2: ......

Страница 3: ...al data table 7 1 10 Dimensions WR and WD versions 8 page 36 Gas fired convection heaters with fan W WR WD series Models 8 10 Technical Information Code 25259501 GB Rev 3 10 05 05 WARNING Whentheburne...

Страница 4: ...open and the electric power supply is on 10 3 2 The instructions to the control panel functions which follow refer to fig 35 a Turn the room thermostat knob E clockwise to the maximum value b Turn swi...

Страница 5: ...e user to carry out the operations indicated in point 11 1 of this manual at least once every two months 9 2 YEARLY INSPECTION 9 2 1 Control and safety devices WARNING Specific technical skills are re...

Страница 6: ...this solution would present technical or functional advantages For ceiling installation WR version in rooms where there is not enough free space on the walls For ceiling installation with duct con nec...

Страница 7: ...d a combustion chamber which houses an atmospheric burner which generates an axial flame The combustion products are exhausted outdoors by a centrifugal fan The ventilation unit which is made up of tw...

Страница 8: ...e the remodelingofbuildingunitsasresidences offices stores orworkshopsiscomplicatedbyaseriesof technical and structural problems that make it difficult to install a traditional heating system These sy...

Страница 9: ...first checking the on off valves on the delivery line Completely bleed off any residual air and restart the unit b Thegassolenoidvalvesdonotopenbecause the coils are malfunctioning or their electrica...

Страница 10: ...tch does not reset the contacts to the proper position see point 8 4 d The flue gas expeller fan s motor has failed and the differential pressure switch will not allow startup to proceed Change the fa...

Страница 11: ...y plastic caps and then using the point of a screwdriverasalevertoreleasethefastening springs in the rear d Remove the 2 screws which attach the gas supply pipe connector to the combustion chamber fig...

Страница 12: ...ses and about the importance of periodic tests which must be performed at least once every year by skilled personnel 6 GAS TYPE CHANGE 6 1 SWITCHING FROM GAS IN THE SECOND GROUP NATURAL GAS TO GAS IN...

Страница 13: ...ressure of 20 mbar Instead if gas from the third group is used LPG first carry out the operations described in point 6 1 5 1 4 Check that the gas on off valves on the meter and on the air heater are o...

Страница 14: ...the wall with a center distance of 120 mm Insert the screw anchors and attach the rear part of the panel to the wall Put the front part of the panel back by snapping it in place Ifyoushouldneedtoinse...

Страница 15: ...R and WD WARNING For your safety due to the weight of the unit and the possible difficulties of installingit itisadvisabletouseamechanical hoisting device for positioning the air heater For these same...

Страница 16: ...ts must be made on the free ends opposite the wind protection terminals Make sure that they are cut squarely and trim off any burrs NOTE The exhaust flue is the longer of the two c Insert the ducts in...

Страница 17: ...R and WD Once the unit s position has been determined bend the supplied paper template on the dashed line and apply it to the ceiling with adhesive tape fig 17 a Indicate the position of the four hole...

Страница 18: ...from ACCORRONI S r l In any case any increases to the length of the ducts must respect the limits specified in the next point 4 2 2 Duct length limits If the duct passes directly through an outside w...

Страница 19: ...between the rear part of the unit and the wall so as to permit correct air intake and to allow the filter to easily be removed for cleaning fig 13 For the WD version make sure that the air intake sys...

Страница 20: ...k making sure to observe the instructions reported on the box indicated by the special graphic symbols When delivered check that no visible damage on the packing and or on the appliance has occurred d...

Отзывы: