Sharp SmartPunch Pro Installation Manual
10
6. Leveling & Height Adjustment
6.1 Height Setting
No height adjustment of the SmartPunch Pro is required, for an installation site with a level floor. If the
floor is uneven then it is recommended to set the level of the SmartPunch Pro using the upstream device
as a reference.
6.2 Adjusting the Casters
a)
Using a 9/16” (15mm) open ended wrench, loosen
the jam nut(s) situated on the caster stud inside of
the machine
.
b)
Using the 9/16” (15mm) wrench, rotate the caster
stems to change the height.
Re-tighten the jam nuts once the correct height is
achieved.
6.3 Fixing the Lock Lever
Once the SmartPunch Pro has been leveled and the correct height set, push it so the front and rear
frames are outside the docking brackets. Push the lock lever in and use an #8-32 to secure in place.