Fig. 73 Fastening cladding support extensions
• Fasten the cladding support extensions to the mast foot. See pos 2, Fig. 73
. Use screw drilling 6.3x22 (delivered with the lift).
• Assemble (suspend) the middle cladding panels from the lower level, 900 -1050 mm from the pit, up
to the top.
• The mast top must always end with a whole middle cladding panel. Therefor you must calculate in
which level the lower middle cladding panel (pos 1, Fig. 74
Assembling of middle cladding panels
)
shall be placed and be cut (if necessary).
• Start with the cut middle cladding panel (if there is one) approx. 900-1050 mm above the pit floor
(pos 1, Fig. 74
Assembling of middle cladding panels
7000 100 en-GB AD
81
Содержание 7000
Страница 1: ...Vector Installation Manual HQ ...
Страница 23: ...ASSEMBLY 5 ASSEMBLY 5 1 FIXINGS 7000 100 en GB AD 19 ...
Страница 25: ...ASSEMBLY Fig 15 Mast preparation before installation 7000 100 en GB AD 21 ...
Страница 27: ...ASSEMBLY Lift the top section 7000 100 en GB AD 23 ...
Страница 30: ...ASSEMBLY Attach the next part of the drive screw to the first see chapter 6 26 7000 100 en GB AD ...
Страница 33: ...ASSEMBLY 7000 100 en GB AD 29 ...
Страница 34: ...ASSEMBLY 30 7000 100 en GB AD ...
Страница 42: ...ASSEMBLY The mast shall stand upright the tolerance is Max 2 mm m 38 7000 100 en GB AD ...
Страница 44: ...ASSEMBLY When the mast is correct aligned finally fasten the fixing bolts 40 7000 100 en GB AD ...
Страница 70: ...ASSEMBLY Fig 59 Mounting of Filled wall panels 66 7000 100 en GB AD ...
Страница 72: ...ASSEMBLY Fig 61 Principal drawing Shaft corners 68 7000 100 en GB AD ...
Страница 100: ...This page is intentionally left blank 96 7000 100 en GB AD ...
Страница 117: ...OPTIONS Fig 126 Electrical connections external door opener 7000 100 en GB AD 113 ...
Страница 140: ...This page is intentionally left blank 136 7000 100 en GB AD ...
Страница 142: ...This page is intentionally left blank 138 7000 100 en GB AD ...