All fixings are delivered with the lift. The number of fixings depends on travel height and execution.
5.2 ASSEMBLY THE MAST, PLATFORM AND DRIVING UNIT
5.2.1
GENERAL
Important
Assemble the mast and platform is a work that requires accuracy and patience. The lit-
tle extra time spent on these adjustments is well invested and makes the lift run
smooth, quiet and without vibrations. The longer lift the more careful you have to be.
Observe that the mast and platform only are coarse adjusted from the factory.
The following steps guides you to the important operations (observe that the steps sometime can be
done in different order depending on installation location).
All steps are important before starting to build the shaft:
1. Plumb and adjust the raised mast/rail frames.
2. Adjust the distance between the guide rail frames and adjust the guide rail joints. See 5.5.1
3. Adjust the lifting yoke in centre of guide rails (the mast). See 5.5.2
4. Adjust the platform horizontal level and centered. See 5.5.3
5.2.2 JOINING THE MAST SECTIONS
The mast is, at delivery, normally divided in several 2235 mm-sections witch shall be joined to the com-
plete mast. If the mast is delivered as one piece this chapter can be skipped.
The mast consists of 3 different sections:
• One bottom section.
• A number of, depending on the mast length, middle sections.
• One top section, usually shorter than 2235 mm.
• Place (if possible) the mast sections as the picture show. The top section closest to the wall, then the
middle sections and furthest from the wall the bottom section.
20
7000 100 en-GB AD
Содержание 7000
Страница 1: ...Vector Installation Manual HQ ...
Страница 23: ...ASSEMBLY 5 ASSEMBLY 5 1 FIXINGS 7000 100 en GB AD 19 ...
Страница 25: ...ASSEMBLY Fig 15 Mast preparation before installation 7000 100 en GB AD 21 ...
Страница 27: ...ASSEMBLY Lift the top section 7000 100 en GB AD 23 ...
Страница 30: ...ASSEMBLY Attach the next part of the drive screw to the first see chapter 6 26 7000 100 en GB AD ...
Страница 33: ...ASSEMBLY 7000 100 en GB AD 29 ...
Страница 34: ...ASSEMBLY 30 7000 100 en GB AD ...
Страница 42: ...ASSEMBLY The mast shall stand upright the tolerance is Max 2 mm m 38 7000 100 en GB AD ...
Страница 44: ...ASSEMBLY When the mast is correct aligned finally fasten the fixing bolts 40 7000 100 en GB AD ...
Страница 70: ...ASSEMBLY Fig 59 Mounting of Filled wall panels 66 7000 100 en GB AD ...
Страница 72: ...ASSEMBLY Fig 61 Principal drawing Shaft corners 68 7000 100 en GB AD ...
Страница 100: ...This page is intentionally left blank 96 7000 100 en GB AD ...
Страница 117: ...OPTIONS Fig 126 Electrical connections external door opener 7000 100 en GB AD 113 ...
Страница 140: ...This page is intentionally left blank 136 7000 100 en GB AD ...
Страница 142: ...This page is intentionally left blank 138 7000 100 en GB AD ...