Assembly Instructions / A170-L..T, A175-L..T
4 Installing the turbocharger / 4.1 Placing the turbocharger on the bracket
© Copyright 2022 Accelleron Industries. All rights reserved.
HZTL455311P0003_EN
Rev. A
June 2022
Fig. 6: Connect the VTG sealing air
XP
Plug connection for power supply
XI
Plug connection for signals
XO
Plug connection for signals
Product
Size
Tightening torque [Nm]
A170-L..T
M20
300 Nm
A175-L..T
M20
300 Nm
Table 5: Tightening torque (56155 / 56156)
u
Connect plug connections (XP, XO, XI) and secure with safety clamp
u
Fit the associated clamps for the cable strain reliefs
u
Position the sealing air throttle valve (56153) with gaskets (56154) between the sealing air line
(from the auxiliary blower) and the sealing air flange (56152)
u
Fit the screws (56155) and nuts (56156) and tighten with the appropriate tightening torque, see
table above.
Page
11
/
17
Содержание A100-L T Series
Страница 2: ......