Setup via the ABL User Interface application
26
After you have set up all Extender charging stations and the external meter for the Controller, you must then de-
fine the parameters for the entire system. To do so, proceed as follows:
12
Make sure you are still logged into the
ABL User In-
terface
application in the
Installer
role.
y
If not, change your role as described in
step 4
.
13
Switch to the
Products > Installation
tab, and, in
the
Actions
column, click the button for the Con-
troller charging station marked with
C
.
14
Set the
Type
to
meter-controlled
and save this
setting by clicking the corresponding tick
in the
Actions
column.
15
Switch to the
Products > Installation
tab, and, in
the
Actions
column, click the button for the Con-
troller charging station marked with
C
.
16
Set the parameters for the controller.
y
Maximum Value:
Enter the maximum charging
current for the entire charging group here (for
example:
160 A
).
y
Fallback Value:
Enter a static maximum current
for the charging group here if the controller does
not receive a measured value from the energy
meter within the specified
Time Limit
(for exam-
ple:
10 A
) (see boxes on next page).
y
Main terminal current limit:
Enter the tripping
current for the building fuse here (for example:
180 A
).
y
Logical-Id of meter:
Set the ID to the position
(
Pos.
) and the model name of the energy meter in
the
Products > Installation
table view here (for
example:
3/ExternalMeter
).
y
Metering type:
Switch the measuring position
between total and section current measurement
here (see page 13).