EN - 9
MB/RAB
6 Operation
6 Operation
1
Open the shielding gas cylinder.
2
Switch on the power supply.
3
Setting the welding parameters.
4
Welding is started.
7 Removal from service
1
Welding is stopped.
2
Wait until the shielding gas flow has subsided and switch off power supply.
3
Close the valve of the shielding gas cylinder.
NOTICE
• Liquid-cooled hose assemblies may start leaking if overheated. This is
why the cooling unit should continue running for approx. 5 min. after
welding.