BAL.0085 • 2017-03-02
EN - 9
ABIMIG
®
W
5 Putting into operation
6
Slide the sharpened liner
through the wire conduit up to the retaining
nipple. Then screw down the nut and tighten it using the switch key wrench.
7
Screw in the contact tip
and attach the gas nozzle
.
5.2.2 PA liner
For using aluminium, copper, nickel and stainless steels:
1
Use the
ABICOR BINZEL
sharpener
PA liner
to an angle of about 40°. Then slide the PA liner
through
the wire conduit until you feel it reach the contact tip
.
2
Slide the clamp nipple, O-ring and nut onto the PA liner
and tighten the
nut under tension.
3
Mark the excess length of PA liner
in front of the wire feed rolls and use
the
ABICOR BINZEL
cutter
to cut it off at the mark.
4
Sharpen the interface using the sharpener
.
5.3 Connecting the cable assembly
1
Join the central connector and central socket at the wire feed unit and
secure them with the connection nut.
2
Properly mount the connections for coolant supply/return, shielding gas
and control lead plug.
NOTICE
• New, as yet unused PA liners have to be shortened to the actual length of
the cable assembly.
• For PA liners with an outer diameter of 4.00 mm, the capillary tube in the
distance adaptor must be replaced with a guide tube.
• We recommend that you sharpen the PA liner to an angle of 40° before
mounting using the
ABICOR BINZEL
sharpener.
WARNING
Risk of burns
The cable assembly overheats if the coolant level is too low.
• Wear the correct protective gloves.
• Check the coolant level at regular intervals.