During handling, take great care not to stress the
insulating parts and the terminals of the circuit
breaker.
Circuit breakers should be installed in their
permanent location as soon as possible. If the
circuit breakers are not placed in service for some
time, it is advisable to provide adequate means of
environmental protection. This may be done by
keeping the circuit breaker in its original shipping
container and storing it in a warm, dry, and
uncontaminated atmosphere. The circuit breakers
should be stored to minimize condensation.
Moisture can cause deterioration of metal parts
and high voltage insulation.
Prior to storage of the circuit breaker, verification
should be made that it is free from shipping
damage and is in satisfactory operating condition.
10
VM1/A/P
- INSTALLATION AND SERVICE INSTRUCTIONS ANSI: ... 15 KV; ... 2000 A; ... 31.5 K A
—
3. Receiving, handling and storage
CAUTION
The apparatus must not be handled by
putting lifting devices directly under the
apparatus itself. Should it be necessary to
use this technique, put the circuit breaker
onto a pallet or a sturdy supporting surface
(see fig. 3). In any case, it is always advisable
to carry out lifting using the supports (3).
3.3. Storage
When a period of storage is foreseen, our
workshops can (on request) provide suitable
packing for the specified storage conditions.
On receipt the apparatus must be carefully
unpacked and checked as described in Checking on
receipt.
If immediate installation is not possible, the
packing must be replaced, using the original
material supplied.
Insert special hygroscopic substances inside the
packing, using at least one standard packet per
piece of apparatus.
Should the original packing not be available and
immediate installation is not possible, store in a
covered, well-ventilated, dry, dust-free, non-
corrosive ambient, away from any flammable
materials and at a temperature between –5 °C and
+45 °C.
In any case avoid accidental impact or positions
which stress the structure of the apparatus.
CAUTION
The shipping containers provided are not
designed for stacking.
Содержание VM1/A/P
Страница 48: ...48 VM1 A P INSTALLATION AND SERVICE INSTRUCTIONS ANSI 15 KV 2000 A 31 5 KA 12 Electric circuit diagram ...
Страница 49: ...MEDIUM VOLTAGE PRODUCTS 49 49 ...
Страница 50: ...50 VM1 A P INSTALLATION AND SERVICE INSTRUCTIONS ANSI 15 KV 2000 A 31 5 KA 12 Electric circuit diagram ...
Страница 51: ...MEDIUM VOLTAGE PRODUCTS 51 51 ...
Страница 52: ...52 VM1 A P INSTALLATION AND SERVICE INSTRUCTIONS ANSI 15 KV 2000 A 31 5 KA 12 Electric circuit diagram ...
Страница 53: ...MEDIUM VOLTAGE PRODUCTS 53 53 ...