![background image](http://html.mh-extra.com/html/abb/vm1-a-p/vm1-a-p_installation-and-service-instructions-manual_2274014.webp)
14
VM1/A/P
- INSTALLATION AND SERVICE INSTRUCTIONS ANSI: ... 15 KV; ... 2000 A; ... 31.5 K A
—
4. Insertion and removal, putting into service
4.2.4. Structure and function
Summary of racking data
Fig. 4
Table 2. Summary Racking Data
Disconnect
Connect
Distance from Disconnected
0 mm / 0 revolutions / 0 inches
200 mm / 20 revolutions / 7.89 inches
Manual opening
Yes
Not recommended unless necessary
Electrical Operation
Yes, while power cord is connect
Yes, while power cord is connect
Control Power Available
Yes, while power cord is connect
Yes
Shutter
CLOSED
OPEN
Primary Contacts Engaged
No
Yes
Requirements to rack breaker from position
Breaker Open / Power cord connect
Breaker Open / Power cord connect
Notes
A
A
Notes A: Closed door is mandatory between all positions
Secondary
disconnects (B)
Racking screw collar
Shutters
Wheel rails
Compartment slots
Содержание VM1/A/P
Страница 48: ...48 VM1 A P INSTALLATION AND SERVICE INSTRUCTIONS ANSI 15 KV 2000 A 31 5 KA 12 Electric circuit diagram ...
Страница 49: ...MEDIUM VOLTAGE PRODUCTS 49 49 ...
Страница 50: ...50 VM1 A P INSTALLATION AND SERVICE INSTRUCTIONS ANSI 15 KV 2000 A 31 5 KA 12 Electric circuit diagram ...
Страница 51: ...MEDIUM VOLTAGE PRODUCTS 51 51 ...
Страница 52: ...52 VM1 A P INSTALLATION AND SERVICE INSTRUCTIONS ANSI 15 KV 2000 A 31 5 KA 12 Electric circuit diagram ...
Страница 53: ...MEDIUM VOLTAGE PRODUCTS 53 53 ...