
- 66 -
000330BG
5 - Installation
C
losing the front cover
At the end of the stage of connecting and configuring the inverter and
before proceeding with the commissioning, the inverter's cover must be
closed.
During the installation of the cover, the installation sequence must be respected as well as
the tightening torque of the 8 screws (set out in the paragraph on technical data) in order to
keep the IP level of the inverter unchanged
• Close the cover following the first 4 steps set out in the diagram.
• Insert and screw in the 8 fixing screws.
• Tighten the screws respecting the sequence and the tightening torque.
At the end of the stage of installing the front cover, it is possible to pro-
ceed with the commissioning of the inverter.
IP65
1
8
6
5
7
3
2
4
TRIO
POWER ALARM
GFI
ESC UP DOWN
ENTER
3
1
5
2
4