35
XX.
DC Power Installation
These instructions assume that all external wiring has been completed to point where
connections have been made to field termination connector, but the connector has not
been plugged into the Termination Panel.
A. Instructions
1)
Apply power:
If installation includes the CWE Optional Pwr/Comm Outlet Box Assembly:
•
Apply power to switch, turn switch to “ON” position.
If installation includes the Optional Equipment Unit with the Optional AC
Charger:
•
Apply power to Charger Regulator.
If installation includes a Solar Panel connected to a Battery:
•
Plug in Charger Regulator battery connector.
2)
Test power using a Multi-Meter connected to J1 terminals of Phoenix
Connector to determine if DC voltage is between 10.5 and 16.0 volts. During
Startup operations, unit will draw a minimum of 13.8 VDC.
3)
If volts are within range, the power should be disconnected, Phoenix
Connector inserted into Termination Panel J1 Connector and power re-
applied. If NGC8200 has optional VGA Screen, unit will show “Totalflow Boot
Loader” followed by navigational screen when functional.
4)
Unit will begin Start-up diagnostics and oven stabilization. This completes the
hardware installation. Proceed to the next chapter “Start-up “ to begin unit