26/72
TLE Series 625 to 1000 PurePulse™ UL S2
UPS Installation Guide / REV-B
TLE Series 1000 - Cabinets positioning and interconnection
Fig. 5.7.1-2 TLE Series 1000 – Cabinets positioning and interconnection
TLE Series 1000, in
standard version,
is delivered split
into two cabinets,
“Power Section
cabinet” and
“In/Out Section
cabinet”.
Align them
together with the
“Power Section
cabinet” on the left
side (cabinet with
Control Panel).
Pay attention, that
no loose cables are
trapped when
pushing the
cabinets together.
Once finally
positioned, the
two cabinets have
to be connected
together with
power and control
wiring.
Refer to Section
4.7.2 and 4.7.3.
Power Section cabinet
In/Out Section cabinet
3b 1
2
3a
8 Bolt M6x12
14.77"
375
mm
6 Bolt M6x12
3.
94
"
100 m
m
9.
97"
/
2
53
m
m
30
.6
0
" /
777
m
m
8 Bolt M6x12
from base
6 Bolt M6x12
12.
80
"
32
5 mm
Fixing type 2
Fixing type 3a
Fixing type 1
(2 pc.)
Fixing type 3b
TLES_UL_1000_S
2_UPS connection
cabinets_ABB_01U
S