![ABB Terra AC Series Скачать руководство пользователя страница 36](http://html.mh-extra.comterra-ac-series_installation-manual_1107036.png)
Procedure
1. Insert the Nano-SIM card (A) into the
socket (B). Make sure that the position of
the connection points is correct.
7.5
Replace the EV charge cable
Preliminary requirements
1.
The standard supplied EV
charge cable on the EVSE
does not agree with the
specifications.
•
EV charge cable within the
specifications. Refer to
•
Torque screw driver
Procedure
1. Get access to the EV charge cable
connection:
a. Remove the cabinet cover. Refer to
.
b. Remove the maintenance cover.
Refer to section
c. Remove the plastic cover.
2. Disconnect the EV charger 2-pin
connector (A) that is receptable to the
CP/PP connector.
3. Loosen the screw (B) on the terminal
block output connector (C).
4. Disconnect the wires:
•
L1(D)
•
L2 (E)
•
L3 (F)
•
Earthing wire (G)
•
Neutral wire (H)
5. Remove the EV charge cable.
A
B
C
H
G
F
D
E
B
A
Electrical installation
36
BCM.V3Y01.0-EN | 001
Содержание Terra AC Series
Страница 1: ...Installation manual Terra AC Copyright 2020 ABB All rights reserved ...
Страница 58: ......