7.3
Connect the AC input cable
7.3.1
Connect the AC input cable (1 phase)
Preliminary requirements
•
Torque screw driver
•
AC input cable (1 phase)
Procedure
1. Loosen the screws (A).
2. Strip the wires. For the specification,
3. Insert the cable connector into the
terminal block (B).
4. Connect the below wires:
1. Earthing wire (C)
2. Neutral wire (D)
3. AC input wire (E)
Refer to section
5. Tighten the screws (A) to the correct
torque. For the specification, refer to
section
.
7.3.2
Connect the AC input cable (split phase)(North America)
Preliminary requirements
•
Torque screw driver
•
AC input cable (1 phase)
Procedure
1. Loosen the screws (A).
2. Strip the wires. For the specification,
3. Insert the cable connector into the
terminal block (B).
4. Connect the below wires:
1. Earthing wire (C)
2. L2 wire for split phase (D)
3. L1 wire for split phase (E)
Refer to section
5. Tighten the screws (A) to the correct
torque. For the specification, refer to
section
.
B
E
C
D
A
B
E
C
D
A
Electrical installation
32
BCM.V3Y01.0-EN | 001