Operation
6.1
Prepare before use
Preliminary requirements
•
Owner
Procedure
1. Appoint a site operator and an installation engineer, if these are other persons
than you.
2. Make sure that the EVSE is installed according to the instructions in chapter
3. Make an emergency plan that instructs people what to do in case of an
emergency.
4. Give instructions to each end user for a charge session. Refer to section
5. Make sure that the manufacturer commissions the EVSE. Contact the
manufacturer when the EVSE is ready for commissioning. Refer to section
.
Danger:
General risk
•
Make sure that you have approval of the manufacturer to use the
EVSE after commissioning. After approval, do not move the EVSE.
6. Make sure that the space around the EVSE cannot get blocked. Think of snow or
other objects. Refer to the floor space requirements. Refer to section .
.
7. Remove condensation before use, to prevent damage to the EVSE.
8. Make sure that maintenance is done on the EVSE. Refer to section
.
6.2
Charge session
6.2.1
Charge an EV
Preliminary requirements
•
Owner
Procedure
1. Park an EV in the parking space. Make sure that the distance from the EV charge
cable is sufficient for connection to the EV.
2. De-energize the EV.
3. Start the charge session. Refer to section
4. Stop the charge session. Refer to section
.
6.2.2
Start a charge session
Preliminary requirements
•
Owner
Operation
9AKK108467A6398-EN | 002
79
Содержание Terra 360 CE
Страница 1: ...Operation and installation manual Terra 360 180 60 CE Copyright ABB All rights reserved ...
Страница 92: ...Procedure 1 Remove these parts 1 Fasteners A 2 Border covers B B A Access to parts 92 9AKK108467A6398 EN 002 ...
Страница 129: ...11 Appendix 11 1 Declaration of conformity Appendix 9AKK108467A6398 EN 002 129 ...
Страница 130: ...Appendix 130 9AKK108467A6398 EN 002 ...
Страница 134: ......