![ABB Terra 360 CE Скачать руководство пользователя страница 56](http://html1.mh-extra.com/html/abb/terra-360-ce/terra-360-ce_operation-and-installation-manual_4121306056.webp)
Procedure
1. Do a check on the transport sensors.
2. Remove the packaging material. To discard the packaging material, refer to
section
3. Make sure that all parts are delivered according to the order. Refer to the order
and section
.
4. If you find damage or the parts are not according to the order, contact the local
representative of the manufacturer.
4.2.2
Do a check of the transport sensors
Preliminary requirements
•
Installation engineer
Procedure
1. Do a check on the sensors (A) that
record the shocks during transport.
2. Do a check on the sensors (B)
that record the maximum tilt during
transport.
3. If the sensors (A) show a red
indication or the sensors (B) show a
tilt that is too high, do these steps:
For the transport specifications, refer
to section
a. Refuse the delivery of the EVSE.
b. Make a note on the delivery
receipt.
c. Within three days of the delivery,
ask the transport company for an inspection.
d. If you see damage on the cabinet, through the packaging material, do not
unpack the EVSE.
e. Contact the manufacturer and give details of the delivery problems.
TiltWatch PLUS
TiltWatch PLUS
ShockDot
WARNING
ShockDot
WARNING
A
B
Transport, handling and unpacking
56
9AKK108467A6398-EN | 002
Содержание Terra 360 CE
Страница 1: ...Operation and installation manual Terra 360 180 60 CE Copyright ABB All rights reserved ...
Страница 92: ...Procedure 1 Remove these parts 1 Fasteners A 2 Border covers B B A Access to parts 92 9AKK108467A6398 EN 002 ...
Страница 129: ...11 Appendix 11 1 Declaration of conformity Appendix 9AKK108467A6398 EN 002 129 ...
Страница 130: ...Appendix 130 9AKK108467A6398 EN 002 ...
Страница 134: ......