5.3.2
Prepare a standard prefabricated foundation
Preliminary requirements
•
Installation engineer
•
Prefabricated foundation.
Refer to section
Procedure
1. Make the foundation (A). Do one of
these steps:
•
Contact the manufacturer to order
the foundation for your EVSE. Refer
to section
.
•
Make the foundation according to
the specifications.
2. Dig the hole (B) for the foundation (C).
For the specifications, refer to section
Caution: Make sure that the
top surface of the foundation
is above the ground level, to
prevent intrusion of water.
3. Prepare the site and the cable duct (D) to bring the AC wires to the location.
4. Install the foundation in the hole.
5. Pour concrete into the hole.
6. Wait until the concrete is hard.
7. Drill the concrete:
•
Drill space to enable the cable duct to pass.
•
Create fixation holes.
5.3.3
Prepare a cast foundation
Preliminary requirements
•
Installation engineer
•
Cast foundation. Refer to
section
.
Procedure
1. Make the cast foundation.
2. Put the cables through the opening in the foundation. Apply the full cable slack.
5.4
Detach the cabinet and base
5.4.1
Detach the cabinet (Terra 360)
Preliminary requirements
•
The foundation is in
position. Refer to section
.
•
Installation engineer
A
B
C
D
Installation
9AKK108467A6398-EN | 002
59
Содержание Terra 360 CE
Страница 1: ...Operation and installation manual Terra 360 180 60 CE Copyright ABB All rights reserved ...
Страница 92: ...Procedure 1 Remove these parts 1 Fasteners A 2 Border covers B B A Access to parts 92 9AKK108467A6398 EN 002 ...
Страница 129: ...11 Appendix 11 1 Declaration of conformity Appendix 9AKK108467A6398 EN 002 129 ...
Страница 130: ...Appendix 130 9AKK108467A6398 EN 002 ...
Страница 134: ......