Installation
5.1
General installation procedure
Preliminary requirements
1.
All required permits to
agree with the local rules,
are granted.
2.
The AC input cable is
available.
•
There is no voltage on the
AC input cable during the
complete installation
procedure.
•
Tools for installation. Refer
to section
Procedure
1. Prepare the site. Refer to section
.
2. Unpack the EVSE. Refer to section
.
3. Move the cabinet above the correct location. Refer to section
.
Note: Make sure that there is some distance between the foundation
and the cabinet to guide the cables into the EVSE.
4. Do the mechanical installation. Refer to section
.
5. Do the electrical installation. Refer to section
6. Prepare for commissioning. Refer to section
.
5.2
Site preparation
5.2.1
Prepare the site
1. Make sure that the space and the airflow around the cabinet is sufficient. Refer
.
2. If the local rules require the installation of an external residual-current device,
install an external residual-current device. Refer to section
.
3. Design the site so that the charge cables can get to the inlet for the charge
cables on the EVs. For the length of the charge cables, refer to section
4. Prepare the cables:
•
AC input cable. Refer to section
•
PE wire. The diameter depends on the length, method of installation and
other factors. Make sure that the PE wire agrees with the safety instructions.
Refer to section
•
Ethernet cable, if no wireless 2G/3G/4G signal is available. Refer to section
. Contact the manufacturer if you require a specific configuration. Refer
to section
.
Note:
•
The cables enter the cabinet from the bottom.
•
Take into account the maximum opening of the cable inlet when
you prepare the cables. Refer to section
.
Installation