5.3.3
Prepare a custom foundation
Preliminary requirements
•
Custom foundation. Refer to section
Procedure
1. Make the custom foundation.
2. Route the cables through the opening in the foundation. Apply the full cable
slack.
5.4
Unpacking
5.4.1
Unpacking procedure
1. Do a check on the transport sensors. Refer to section
2. Remove the packaging material.
3. Discard the packaging material. Refer to section
4. Do a visual check for damage on the outside and inside of the EVSE.
5. Make sure that all parts are delivered according to the order. Refer to the order
.
6. If you find damage or the parts are not according to the order, contact the local
representative of the manufacturer.
7. Remove the border covers. Refer to section
8. Remove the cabinet from the pallet. Refer to section
.
5.4.2
Do a check on the transport sensors
1. Do a check on the sensors (A) that
record the shocks during transport.
2. Do a check on the sensors (B) that
record the maximum tilt during
transport.
3. If the sensors (A) show a red
indication or the sensors (B) show a
tilt that is too high, do these steps:
For the transport specifications, refer
a. Refuse the delivery of the EVSE.
b. Make a note on the delivery
receipt.
c. Within three days of the delivery,
ask the transport company for an inspection.
d. If you see damage on the cabinet, through the packaging material, do not
unpack the EVSE.
e. Contact the manufacturer and give details of the delivery problems. Refer to
.
TiltWatch PLUS
TiltWatch PLUS
ShockWatch
ShockWatch
A
B
A
B
Installation
BCM.S1102.0-EN | 001
27