4 Repair
4.2.1. Repair activities
3HAC027309-001 Revision: D
170
©
Co
py
rig
h
t 200
6-
201
0 ABB. All righ
ts reser
v
ed.
4.2 DressPack cable package
4.2.1. Repair activities
General
The section below details the main activities of replacing the cable packages or parts thereof.
Procedures
For information about:
See:
Replacement of the cable package IRBDP MH2 CE
and IRBDP SW2 CE
Detailed in section
cable package IRBDP MH2
CEandIRBDP SW2 CE on page 171
.
Replacement of
process cable package lower arm -
IRBDP MH 3 LE
.
Detailed in section
the lower arm cable package -
IRBDP MH 3 LE on page 177
.
Replacement of
process cable package upper arm -
IRBDP MH 3 UE
.
Detailed in section
upper arm cable package - IRBDP
MH 3 UE on page 182
.
Replacing the cable package IRBDP SW5 CE
(SpotPack Basic).
Detailed in section
cable package IRBDP SW5 CE
(SpotPack Basic) on page 185
.
Replacement of
tension arm unit
Detailed in section
Replacement of
hose reinforcement
Detailed in section
hose reinforcement on page 205
.
Replacement of
slide sleeves
Detailed in section
Repair of
process cable package
Detailed in section
Adjusting
tension arm unit
Detailed in section
Содержание SpotPack IRB 6620
Страница 1: ...ABB Robotics Product manual DressPack SpotPack IRB 6620 ...
Страница 2: ......
Страница 8: ......
Страница 16: ...Product name principles 3HAC027309 001 Revision D 14 Copyright 2006 2010 ABB All rights reserved ...
Страница 288: ......
Страница 289: ......