2 Installation
2.2.9. Fitting the cable package IRBDP SW5 CE (SpotPack Basic)
3HAC027309-001 Revision: D
88
©
Co
py
rig
h
t 200
6-
201
0 ABB. All righ
ts reser
v
ed.
4. Remove the
part of the backplate
where
process and customer plates are supposed
to be fitted. Hit the removable part with a
plastic mallet or similar without damaging
other parts of the backplate.
NOTE!
Only needed when the cable package is
fitted for the first time!
xx0700000404
Parts:
•
A: Removable part of backplate
•
B: Holes for attachment screws
5. Run the cables and hoses down through the
center hole of gearbox axis 1 in the
following order:
•
Signal cable
•
Hoses, slightly to the right of the
signal cable
•
Check that signal cable and hoses
do not end up between the motor
cables
•
Check that cables and hoses do not
cross each other.
6. Fit the process cable package to the frame
with the
cable and hose clamp
.
Shown in the figure
.
7. Fit the process cable package to the
clamp
holder with plastic clamp
. Position of cables
and hoses is shown in the figure.
Shown in the figure
.
xx0800000079
Positions:
•
A: PROC 1 (blue)
•
B: PROC 2 (green)
•
C: PROC 3 (red)
•
D: PROC 4 (black)
•
E: Signal cable
•
F: Weld cable
Action
Note
Continued
Continues on next page
Содержание SpotPack IRB 6620
Страница 1: ...ABB Robotics Product manual DressPack SpotPack IRB 6620 ...
Страница 2: ......
Страница 8: ......
Страница 16: ...Product name principles 3HAC027309 001 Revision D 14 Copyright 2006 2010 ABB All rights reserved ...
Страница 288: ......
Страница 289: ......