3 Maintenance
3.3.2. Preventive inspection, DressPack upper end
3HAC027309-001 Revision: D
154
©
Co
py
rig
h
t 200
6-
201
0 ABB. All righ
ts reser
v
ed.
Inspection - Full speed
The following procedure details how to inspect the DressPack at the upper arm, when the
robot is moving in full speed.
WARNING!
A robot in motion is dangerous and may cause severe personal injuries, if safety procedures
are not followed. Hence, all work must be performed outside the robots working range and
outside the robots safety area.
Secure the following before work starts:
•
Check that all emergency stops are fully functional.
•
Close and activate all safety equipment (safety gates and/or safety curtains etc.).
Action
Note
1. Make sure that no hoses or cables, or
parts thereof, touch any part of the robot
structure (or something in the vicinity of it)
in a way that may cause wear.
2. Make sure all cables and hoses move
smoothly together during operation and
that no part of the cable package moves in
a different pattern.
3.
(Not applicable to cable package
IRBDP MH 3 UE)
Make sure that when the robot program is
running, the movement of the tension arm
unit shall be smooth, but still strong
enough to retract the hose package
without excessive force.
Continued
Содержание SpotPack IRB 6620
Страница 1: ...ABB Robotics Product manual DressPack SpotPack IRB 6620 ...
Страница 2: ......
Страница 8: ......
Страница 16: ...Product name principles 3HAC027309 001 Revision D 14 Copyright 2006 2010 ABB All rights reserved ...
Страница 288: ......
Страница 289: ......