Assembly Instructions
1HSB435410-2 enrev1
i
LIST OF CONTENTS
1. General ................................................................................ 1
2. Safety................................................................................... 3
2.1
Warning text ................................................................................... 3
2.2
Safety, general ................................................................................ 4
3. Delivery ............................................................................... 5
3.1
Weights........................................................................................... 5
3.2
Unpacking ...................................................................................... 6
3.3
Storage before assembly ................................................................ 7
4. Assembly............................................................................. 9
4.1
Preparations.................................................................................... 9
4.2
Frame assembly............................................................................ 11
4.3
Assembling the frame on the foundation ..................................... 12
4.4
Assembling the circuit-breaker pole on the frame ....................... 13
4.5
Preparations for assembling the operating mechanism and
protective tube .............................................................................. 15
4.6
Assembling the operating mechanism ......................................... 16
4.7
Assembling the protective tubes between the poles..................... 17
4.8
Final assembly of the circuit-breaker pole ................................... 17
4.9
Assembling the pull-rods ............................................................. 18
4.10 Inspecting the bolted joints, etc.................................................... 23
5. Electrical connections ..................................................... 25
5.1
Connection of the operating mechanism...................................... 25
5.2
Assembly of busbars or overhead lines........................................ 25
5.3
Tensioning the closing springs ..................................................... 26
6. Pressurising the poles ..................................................... 27
6.1
Preparations.................................................................................. 27
6.2
Gas filling with SF6 gas ............................................................... 28
6.3
Gas monitoring system................................................................. 31
6.4
Leakage test.................................................................................. 32
6.5
Final inspection of the pull-rod system........................................ 32
6.6
Fitting the signs and covers.......................................................... 34
7. Commissioning................................................................. 35
8. Operating values .............................................................. 37
Содержание SF6 LTB 245E1 BLG 1002A
Страница 1: ...Product Manual 1HSB435416 2 en Rev 1 LTB 245E1 BLG 1002A 3 pole operation ...
Страница 63: ...ABB Switchgear SF6 Circuit Breaker Circuit breakers HPL and LTB 1HSB445410 100 en rev1 Check list assembly ...
Страница 68: ...ABB Switchgear SF6 Circuit Breaker Type LTB E 1HSB435409 100 enrev1 Operating and Maintenance Instructions ...
Страница 92: ...ABB Switchgear SF6 Circuit Breaker Circuit breakers HPL and LTB 1HSB445409 1 en0 Lubricants ...
Страница 94: ...Lubricants 1HSB445409 1 en0 i LIST OF CONTENTS 1 General 1 1 1 Safety instructions 1 2 Oil 3 3 Grease 5 ...
Страница 100: ...ABB Switchgear SF6 Circuit Breaker Operating Mechanism type BLG 1002A 1HSB515409 100 en rev2 Maintenance ...
Страница 184: ...ABB Switchgear SF6 Circuit Breaker Operating mechanism type BLG 1002A 1HSB515409 200 en rev2 Spare Parts ...
Страница 198: ......
Страница 199: ......
Страница 209: ......
Страница 210: ......