The Package Compact Substations are  completely self-contained, mounted on an integral base, factory
assembled in a totally enclosed, aesthetically and acceptable cladding, vandal-proof, vermin-proof and
weather-proof housing ready for installation into position on a concrete base pad or pier.

The base frame is of welded  structural steel and been hot-dipped galvanized after fabrication to assure
affective corrosion resistance in service.

Housing of the Package Compact Substation is made of special material called ALUZINK, a sheet steel
with a metallic alloy coating. The alloy consists of 55% aluminum and 43.4% zinc. This provides
optimum corrosion protection.

The housing has three  compartments, separated with ALUZINK sheet. The transformer compartment is
completely separated from the medium voltage and low voltage compartments.

RECEIVING / INSPECTION / STORAGE

The Package Compact Substation is shipped  from the factory ready for installation on site. It has been
submitted  to  all normal routine tests before being shipped, and it is not required to do any voltage testing
before putting it into service, provided the substation has not sustained any damage during transportation.

Immediately  upon  receipt of the Package Compact Substation, examine them to determine if any damage
or loss was sustained during transit. If abuse or rough handling is evident, file a damage claim with carrier
and promptly notify the nearest ABB office. ABB ELECTRICAL INDUSTRIES CO. LTD. is not
responsible  for  damage of goods after delivery to the carrier; however, we will lend assistance if notified
of claims.

PERSONNEL SAFETY

The  first and most important requirements are the protection against contact with live parts during normal
service as well as maintenance or modifications.

This is the reason why all live parts  have been metal enclosed, so that when the parts are live and the
Package Compact Substation doors are open, no one can be able to touch them.

Also, it is safe in case any short-circuiting or sparking occurs at the busbars.

VENTILATION

Transformer compartment has been  provided with sand trap louvers, to prevent ingress of sand and that
proper air circulation should take place.

EARTHING

Proper earthing busbar has been provided.

HANDLING

Lifting  lugs  has  been  provided  on  top  of  four  corners of the housing for lifting the DPS by crane and
chains  as  a  single  unit, otherwise this can be done by a forklift of sufficient capacity, but the lifting fork
must be positioned under the transformer portion.

Содержание SAHARA 1000

Страница 1: ...ipment ABB Electrical Industries Co Ltd Kingdom of Saudi Arabia ABB SAHARA Series Compact Substation OPERATING INSTRUCTIONS MODELS 24kV 36kV SAHARA 500 SAHARA MAX 1 SAHARA 1000 SAHARA MAX 2 SAHARA 1600 SAHARA 2000 SAHARA 3000 ...

Страница 2: ...cal Inspection 7 MAINTENANCE AND PERIODIC INSPECTION 7 Bolt Tightness 7 Inspection and Testing 7 Routine Field Testing 8 1 Insulation Resistance Test 8 2 Connection Test 9 3 Mechanical Operation 9 TRANSFORMER MAINTENANCE 9 Inspection during operation 9 Maintenance during operation 9 Inspection and Measures to be taken during downtime 9 Inspection of oil leaks and precautions to be taken 9 Inspecti...

Страница 3: ...rtance of care in Site selection and design embodying features that provide adequate ventilation protection and security and which have taken account of appropriate fire moisture and explosion hazards Jointing Earthing Selection and setting of electrical protection in primary and secondary against overload overvoltage and short circuit Carrying out regular inspection and electrical and mechanical ...

Страница 4: ...ion has not sustained any damage during transportation Immediately upon receipt of the Package Compact Substation examine them to determine if any damage or loss was sustained during transit If abuse or rough handling is evident file a damage claim with carrier and promptly notify the nearest ABB office ABB ELECTRICAL INDUSTRIES CO LTD is not responsible for damage of goods after delivery to the c...

Страница 5: ... LIFT OR MOVE A TRANSFORMER OR PACKAGE COMPACT SUBSTATION WITHOUT ADEQUATE EQUIPMENT AND PRECAUTIONS 2 TERMINALS ARE FOR ELECTRICAL LOADING ONLY 3 DO NOT MAKE ANY CONNECTIONS THAT ARE NOT AUTHORIZED BY THE NAMEPLATE OR CONNECTION DIAGRAMS 4 DO NOT ENERGIZE THE SUBSTATION WITHOUT PROPERLY MADE GROUND OR EARTH CONNECTIONS 5 DO NOT ATTEMPT TO CHANGE THE TAP SETTINGS WHILE THE TRANSFORMER IS ENERGIZED...

Страница 6: ...due stress on the terminals Conductors should be securely fastened in place and adequately supported with allowances for expansion and contraction FINAL INSPECTION PRIOR TO ENERGIZATION After the Package Compact Substation has been found to be in good condition and the protective equipment is operational the substation may be connected to the network However it is recommended that the transformer ...

Страница 7: ...awings and previous test records before starting activity Scrutinize maintenance instructions given for the equipment to be maintained Maintenance information is given in the Operation and Maintenance Manual for each type of equipment The main dangers of such process are Inaccessible lubrication points greased for life cannot be lubricated and may seize up Areas not lubricated may be subject to co...

Страница 8: ...estigated for possible contamination on the surfaces NOTE For individual circuit protective device s resistance readings load and line conductors should be disconnected If not disconnected the test measurements will also include the characteristics of the attached circuits A temperature and humidity reading are recommended and recorded during the testing period Insulation resistivity is markedly e...

Страница 9: ...ntenance measures can be carried out which can not normally be performed during operation Before starting maintenance work the transformer has to be disconnected from the network and earthed or grounded When the disconnector has been opened one has to see to that they stay open and before grounding or earthing one has to test that they are voltage free i e with a voltage tester Inspection of oil l...

Страница 10: ...ten of milliamperes With the same voltage reading the current taken by other phases can be measured The excitation currents of different phases should be approximately the same magnitude In a damage phase the current can rise to tens of amperes thus the regulating transformer has to be protected by a suitable fuse 4 DC resistance of windings A satisfactory large DC source and an accurate resistanc...

Страница 11: ...energy may be different for different fuse types as well as the selection tables and protection characteristics It is compulsory to use the same type of fuse links in all phases type rated current The disconnector cannot be closed before the fuse links are changed Note According to IEC Publication 282 1 all 3 fuse links should be replaced even if only 1 or 2 of the fuse links in the three phase sy...

Страница 12: ...uring periodic checks established the best fixed periods for maintenance work It is also advisable to refer to the following rules The circuit breakers that operate rarely or which remain closed or open for long periods must be activated once in a while to prevent a tendency to jam which might cause reductions in the closing or opening speed During service circuit breaker must be visually check fr...

Отзывы: