background image

This action must be confirmed before it is carried out, because it overwrites the
IED's existing display configuration. The writing operation can take a few
seconds or minutes to complete.

3.

To read the configuration from the IED, click the 

Read from IED

 button on the

toolbar.

6.1.9 

Previewing configuration

After the pages have been configured, the configuration can be previewed with a soft
LHMI before it is written to the IED. The soft LHMI is a Windows version of the
actual LHMI.

To launch the soft LHMI and to preview the configuration, click the 

Show

Preview

 button.

GUID-BC7D2EB6-D6CC-410C-B73E-0FDF3568C762 V1 EN

Figure 101:

Launching the LHMI preview

6.1.10 

GDE configuration export and import

The GDE configuration can be exported and then imported to any other IED.

6.1.10.1 

Exporting GDE configuration

1.

On the 

File

 menu, point to 

Display Editor Template

 and select 

Export

.

2.

In the 

GDE Export

 dialog, select the pages, SLD pages, custom symbols and

translations to be exported.

Section 6

1MRS759117 A

LHMI engineering

122

REX640

Engineering Manual

Содержание RELION REX640

Страница 1: ...RELION PROTECTION AND CONTROL REX640 Engineering Manual...

Страница 2: ......

Страница 3: ...Document ID 1MRS759117 Issued 2019 05 08 Revision A Product version 1 Copyright 2019 ABB All rights reserved...

Страница 4: ...opied or disclosed only in accordance with the terms of such license Trademarks ABB and Relion are registered trademarks of the ABB Group All other brand or product names mentioned in this document ma...

Страница 5: ...ted and communicate data and information via a network interface which should be connected to a secure network It is the sole responsibility of the person or entity responsible for network administrat...

Страница 6: ...al equipment for use within specified voltage limits Low voltage directive 2014 35 EU This conformity is the result of tests conducted by the third party testing laboratory Intertek in accordance with...

Страница 7: ...d to carry out the electrical installation National and local electrical safety regulations must always be followed The frame of the protection relay has to be carefully earthed The protection relay c...

Страница 8: ......

Страница 9: ...4 Installing connectivity packages 24 Installing connectivity packages by using the connectivity package installer 25 Installing connectivity packages by using Update Manager 25 Activating connectivit...

Страница 10: ...guration parameters 70 Connections and variables 70 Hardware channels 71 User customized I O channel configuration 72 Online monitoring 76 Validation 76 Validation when creating application configurat...

Страница 11: ...109 Creating categories 113 Creating states 113 SLD Editor 114 Adding bus bars 115 Managing bus bar coloring 116 Adding symbols to an SLD page 117 Creating SLD pages 119 Language Translation 120 Savi...

Страница 12: ...nction view for IEC 61850 in PCM600 133 Station configuration description file types 134 IEC 61850 engineering process 134 Exporting SCL files from PCM600 135 Exporting SCD files 135 Exporting ICD or...

Страница 13: ...61850 and other supported protocols 1 2 Intended audience This manual addresses system and project engineers involved in the engineering process of a project and installation and commissioning personn...

Страница 14: ...product life cycle 1 3 2 Document revision history Document revision date Product connectivity level PCL History A 2019 05 08 1 First release 1 3 3 Related documentation Name of the document Document...

Страница 15: ...ent may result in degraded process performance leading to personal injury or death Therefore comply fully with all warning and caution notices 1 4 2 Document conventions A particular convention may no...

Страница 16: ...3I 51P 2 Three phase non directional overcurrent protection instantaneous stage PHIPTOC 3I 50P Three phase directional overcurrent protection low stage DPHLPDOC 3I 67P 51P 1 Three phase directional o...

Страница 17: ...Three phase thermal protection for feeders cables and distribution transformers T1PTTR 3Ith F 49F Three phase thermal overload protection two time constants T2PTTR 3Ith T G C 49T G C Three phase overl...

Страница 18: ...and instantaneous differential protection for machines MPDIF 3dl M G 87M 87G Underpower factor protection MPUPF PF 55U Stabilized and instantaneous differential protection for two or three winding tr...

Страница 19: ...zing check SECRSYN SYNC 25 Tap changer control with voltage regulator OL5ATCC COLTC 90V Transformer data combiner OLGAPC OLGAPC OLGAPC Petersen coil controller PASANCR ANCR 90 Condition monitoring and...

Страница 20: ...monic distortion DC component TDD THD DC and individual harmonics CHMHAI PQM3IH PQM ITHD IDC Voltage total harmonic distortion DC component THD DC and individual harmonics VHMHAI PQM3VH PQM VTHD VDC V...

Страница 21: ...R_TRIG Falling edge detector F_TRIG F_TRIG F_TRIG Real switch selector SWITCHR SWITCHR SWITCHR Integer 32 bit switch selector SWITCHI32 SWITCHI32 SWITCHI32 SR flip flop volatile SR SR SR RS flip flop...

Страница 22: ...1850 9 2LE SMVSENDER SMVSENDER SMVSENDER Redundant Ethernet channel supervison RCHLCCH RCHLCCH RCHLCCH Ethernet channel supervision SCHLCCH SCHLCCH SCHLCCH HMI Ethernet channel supervision HMILCCH HMI...

Страница 23: ...OS_OP Switching device status decoder OK status T_POS_OK T_POS_OK T_POS_OK Controllable gate 8 Channels GATEGAPC GATEGAPC GATEGAPC Security application GSAL GSAL GSAL Hotline tag HLTGAPC HLTGAPC HLTGA...

Страница 24: ...16...

Страница 25: ...ng HMI Event Filtering Communication management IEC 61850 station communication engineering is done using the internal IEC 61850 Configuration tool or the separate IET600 PCM600 interacts with IET600...

Страница 26: ...organizing user rights PCM600 user management Organizing users regarding their rights profiles and passwords to use different tools and tool functions Defining allowed activities for user profiles to...

Страница 27: ...within the voltage level IED selection of the IED that is used in the bay several IEDs can be inserted in a bay for example one control device and two protection relays 2 2 Default configuration The...

Страница 28: ...03 E669 40F3 86EE 828FEFAA7EE5 V1 EN Figure 3 Protection relay engineering workflow proposal based on practical experience and dependencies of the steps It is possible to follow a different sequence b...

Страница 29: ...diagrams shown on the LHMI and the WHMI and symbols and to provide language translations for the LHMI elements Communication protocol engineering The communication engineering details are protocol dep...

Страница 30: ...22...

Страница 31: ...CM600 provides the ability to export the configuration of the devices or an entire substation in a standard file format which enables station engineering in separate IEC 61850 system configuration too...

Страница 32: ...le it contains a list of the existing parameters data format used units setting range access rights and visibility of the parameters In addition it contains code which allows the software packages tha...

Страница 33: ...n number 3 Follow the steps in the connectivity package installation wizard 3 2 1 2 Installing connectivity packages by using Update Manager 1 In PCM600 click Help and select Update Manager Run Update...

Страница 34: ...vated in Update Manager 1 Select Manage Connectivity Packages from the menu on the left column to access the installed connectivity packages 2 Browse the tree structure to find the correct product 3 S...

Страница 35: ...an be created and managed by PCM600 but only one project can be active at a time Regardless of the protocol used in installation for each project it is possible to have Edition1 and Edition2 relays co...

Страница 36: ...es not occur if the protection relay contains the factory default technical key The technical key property in PCM600 corresponds to the IED name attribute in SCL files Avoid changing the IED name attr...

Страница 37: ...ust also be relative within an object hierarchy The maximum length is 100 PCM600 supports both possibilities The two signal designations are available per object in Object Properties for all the hiera...

Страница 38: ...station in the project J1 voltage level from 20 to 30 kV Q03 third bay in the voltage level A1 first IED in bay Q03 3 4 2 Setting technical key The maximum length of the technical key is 28 characters...

Страница 39: ...00 Setting the technical key on the IED level A dialog box opens to inform about the technical key concept GUID 5E1C6373 8E94 4898 9177 D8519281963B V1 EN Figure 10 Technical key information 2 Click O...

Страница 40: ...me or select Technical key in IED if the value is already given to another IED object in the PCM600 project An error message is displayed if this happens 3 5 Communication between PCM600 and protectio...

Страница 41: ...are optional Table 2 IP ports used by the relay Port number Type Default state Description 20 21 TCP Open File transfer protocol FTP and FTPS 102 TCP Open IEC 61850 443 TCP Open Web server HTTPS 123...

Страница 42: ...w communication card firmware LHMI firmware or application need new IED firmware it is updated at the same time otherwise a second update with the same package is needed to update the IED firmware 3 6...

Страница 43: ...ernet interface connector of the communication module with a custom IP address 3 6 2 Updating firmware or language 1 Select the update mode Firmware Language 2 Select the update package and click Next...

Страница 44: ...Figure 13 Choosing the relay for the update 4 If required clear the life cycle handling indication by selecting the Clear Lifecycle Handling indication on Local HMI after update check box Section 3 1...

Страница 45: ...otely wait for 30 seconds for the local user confirmation before proceeding with the update The local user can cancel the update via the LHMI by pressing Cancel Update during the 30 second window IED...

Страница 46: ...GUID A7AB825F 2D3D 4C96 9821 48F29FAC1B75 V1 EN Figure 15 Waiting for local user confirmation with remote update Section 3 1MRS759117 A PCM600 38 REX640 Engineering Manual...

Страница 47: ...GUID 93FD9533 8D6C 4844 9740 DF73C8B9FE52 V1 EN Figure 16 Completing the update 1MRS759117 A Section 3 PCM600 REX640 39 Engineering Manual...

Страница 48: ...40...

Страница 49: ...New Project If there are projects or object tools open a confirmation dialog box opens GUID DE5ECCCA 3702 4E03 98FA A9EB5830F5AE V1 EN Figure 17 Confirming project and object tool closing 5 In the Cr...

Страница 50: ...the necessary IEDs has to be built 1 Create a new plant structure in one of the alternative ways Right click the Plant Structure view point to New and select Create from Template Right click the Plant...

Страница 51: ...iew 4 3 IED insertion The context menu or the Object Types view shows the available IEDs that can be inserted on the bay level of the plant structure according to the installed connectivity package It...

Страница 52: ...elay is connected to PCM600 PCM600 can read the composition code directly from the relay It is possible to read the full configuration from the relay by using the Read from IED function 1 In the Plant...

Страница 53: ...C0E V1 EN Figure 21 Selecting the configuration mode 3 On the Communication protocol page select the communication protocol from the IED Protocol list and click Next 1MRS759117 A Section 4 Setting up...

Страница 54: ...tocol 4 On the IEC 61850 communication settings page select the port from the Port list If the LAN port is selected type the correct IP address of the physical protection relay to be configured to the...

Страница 55: ...communication port and IP address Communication configuration is now defined 5 Click Next to scan read the composition code of the protection relay 6 On the Composition code detection page click Next...

Страница 56: ...uration to create an empty configuration Select Import configuration from file PCMI PCMT to import any existing example configuration Click Browse to select the pcmi or pcmt file that has the example...

Страница 57: ...d as default configuration is only supported for the IEC 61850 Edition 2 IEDs To configure an IEC 61850 Edition 1 IED select empty or example configuration and make the proper selections on the next p...

Страница 58: ...d Edition2 relays configured in the same PCM600 project The PCM600 project s SCL edition is the highest SCL edition relay in the project 9 On the Summary page click Finish to confirm the configuration...

Страница 59: ...m the protection relay and proceeding is prevented if the IED is not online or if the IP address is not correct 4 3 2 Inserting an IED in offline mode When the protection relay is not available or is...

Страница 60: ...e it is not necessary to type the correct IP address in the IP address box GUID B4B6B577 1C7B 40C2 BD9B C5FC5FC087C2 V1 EN Figure 28 Selecting the configuration mode 3 On the Composition code selectio...

Страница 61: ...configuration from file PCMI PCMT to import an example configuration Click Browse to select the pcmi pcmt file that has the example configuration Select Default configuration available only for IEC 6...

Страница 62: ...can be built from all the exported IED templates It is also possible to insert an IED from the template library to create a new IED in the plant structure After a template IED has been imported IP add...

Страница 63: ...ck Import Template To insert the selected IED to the bay click Create It is possible to insert more than one IED from the Create New Object from Template dialog box The dialog box remains open until C...

Страница 64: ...ct The IP address and subnet mask of the IED object in PCM600 must match the HMI and LAN ports of the protection relay physical IED to which the PC is connected The IP address of the protection relay...

Страница 65: ...E8724F42F1E0 V1 EN Figure 33 Alternative 1 Setting the IP address on the first wizard page 1 In the Plant Structure view select the IED whose IP address must be entered 2 On the View menu select Obje...

Страница 66: ...n port can be selected from the project structure When using the HMI port DHCP server functionality must be activated in the computer network adapter settings to get the IP address from the relay Alte...

Страница 67: ...IEDs GUID 47B5C1BB 0701 44FE 9819 B49060F6DD6C V1 EN Figure 36 Creating a PCM600 project including several IEDs 2 Export the SCD file from PCM600 In the Plant structure view select the substation rig...

Страница 68: ...7 Exporting a SCD file from PCM600 3 Import the SCD configuration into the SAB600 project In the Project Explorer view right click the IEC61850 OPC Server object and select SCL Import Section 4 1MRS75...

Страница 69: ...ion into the SAB600 project 4 In the SCL Import view click Select File to select the SCD file exported from PCM600 GUID 3411E34A 1452 4F87 AADD 784444457355 V1 EN Figure 39 Creating a new IED in the S...

Страница 70: ...unication is supported for the WHMI it must be accessed from a Web browser using the HTTPS protocol Three WHMI sessions at a time are supported 1 To enable the WHMI select Configuration HMI Web HMI mo...

Страница 71: ...ion identification The IEC 61850 version of a PCM600 project can be identified from the Object Properties pane of the project GUID 46184607 ADA7 4981 9B95 9477B20E003B V1 EN Figure 40 Project s IEC 61...

Страница 72: ...64...

Страница 73: ...tion blocks which are mandatory and thus cannot be removed from the relay configuration by removing them from Application Configuration Other function blocks are not mapped as logical nodes for exampl...

Страница 74: ...Function block data can be modified with Application Configuration in PCM600 User defined names can be given for function blocks and signals Signals that have a user defined name created with Applicat...

Страница 75: ...tion order 13 Cycle time 14 Instance number 5 1 2 Signals and signal management The function block has a set of input and output signals The placement of function block signals is from left to right I...

Страница 76: ...n the same cycle time 5 1 3 Function block execution parameters Three function block execution parameters influence the runtime execution of the function block within the application configuration Exe...

Страница 77: ...d automatically in the Application Configuration tool but it can also be set manually If the automatically calculated value causes the function to be executed one task cycle time after the other logic...

Страница 78: ...B1 B2 O AND O 84 T 2 5 I 5 B1 B2 O NOT O 80 T 2 5 I 5 IN OUT OR O 247 T 2 5 I 9 B1 B2 O GUID 4AC672A0 D818 4CB3 BEF9 95079313A38E V1 EN Figure 45 Feedback loop situation with manually fixed execution...

Страница 79: ...V Connection validation A connection is only useful or even possible between two signals of the same base attribute type GUID 095E339A 1455 4659 9B87 FFC6F4F37A6A V1 EN Figure 46 Application Configura...

Страница 80: ...ded A hardware binary output channel is taken from the list of available channels when a new channel is requested This prevents using the same hardware binary output channel twice 5 1 7 1 User customi...

Страница 81: ...or possible missing connections Once the output is connected the complete configuration is validated again Example 2 UTVTR1 O 2 T 2 5 I 1 UL1 UL2 UL3 MINCB_OPEN URES ALARM WARNING URES_ALARM URES_WARN...

Страница 82: ...2 T 2 5 I 1 UL1 UL2 UL3 MINCB_OPEN URES ALARM WARNING URES_ALARM URES_WARNING U3P URES_CLC URES_MEAS URES_CLC_DR URES_MEAS_DR U1_DR U2_DR U3_DR NPS_DR PPS_DR FREQ_DR SMVSENDER O 14 T 2 5 I 0 I3P IRES...

Страница 83: ...in the application to connect analog inputs to other function blocks Example 4 LED10 O 2 T 2 5 I 10 OK ALARM RESET Slot B BIO X1 1 4_BI1 Input 1 ALARM GUID DB87B9BD 87FE 4165 83B8 0C58D2218207 V1 EN F...

Страница 84: ...PCM600 are the same the online monitoring starts The online monitoring ends and the tool returns to the configuration mode if the Work Offline button is clicked Online monitoring cannot be started if...

Страница 85: ...connected to an output signal that is not connected Example if an output from a higher execution order function is connected to the inputs of a lower execution order function Errors marked with a red...

Страница 86: ...nctionality prevents too complex configurations from being used and possibly risking IED protection functionality Calculation results are divided into two different sections OK and Error At 100 percen...

Страница 87: ...ool overwrites any parameter changes made locally with LHMI All parameters displayed in the parameter list can be sorted into two groups Configuration parameters Setting parameters 5 2 1 Configuration...

Страница 88: ...relay setting parameters and to export those to files which can be used by PCM600 The setting export and import are sensitive to the protection relay s content Settings are exported and imported for o...

Страница 89: ...Matrix Signal Matrix is used to make cross references between the physical I O signals function blocks and SMV and for the GOOSE signal input engineering Application Configuration is used for adding o...

Страница 90: ...nnected to several different function blocks in the Application Configuration tool the connection appears as glue logic in Signal Matrix A binary output channel can only be activated from one function...

Страница 91: ...need to be one to one and unconnected SMVRCV blocks are not allowed Signal Matrix has a separate sheet for each possible combination Binary inputs Binary outputs Analog inputs GOOSE SMV 5 4 Load Profi...

Страница 92: ...gure 62 Opening the Load Profile tool To close the Load Profile tool click Close in the tool The Load Profile tool runs in the same process as PCM600 but in a separate window Multiple instances of the...

Страница 93: ...7815DD78F47 V1 EN Figure 63 Load Profile tool By default the Load Profile tool uses the PCMDataBases LPR directory as a saving target directory 1MRS759117 A Section 5 Protection and control engineerin...

Страница 94: ...mp LoadProfileTool on the local machine In this temporary folder the target file name is constant and loading again overwrites the file An unsaved record is deleted when the tool is closed Save Clicki...

Страница 95: ...7D V1 EN Figure 65 Information fields 5 5 Fault Record tool The Fault Record tool is used for reading the fault records from the protection relay and it is included in the connectivity packages The to...

Страница 96: ...on when PCM600 is closed The Fault Record tool is a connectivity package tool The main functionality is divided into three parts reading the fault record parameters from the protection relay displayin...

Страница 97: ...ndicate an ongoing read operation Clicking Cancel on the Read progress bar cancels the read operation On operation completion the available fault records are shown in the record grid Clicking the icon...

Страница 98: ...h lists the differences between the IED configurations IED Compare provides an option to compare an IED configuration stored in PCM600 IED or pcmi file IED Compare can compare certain types of IED con...

Страница 99: ...ication display GOOSE and parameter configuration differences are grouped and listed under the corresponding headings GUID 9350D328 8BFC 478D 8DAE 646CED8B0231 V1 EN Figure 68 Compare options Each con...

Страница 100: ...cation LD0 LLN0 Mod Table 7 Test mode Test mode Description Protection BEH_BLK Normal mode Normal operation FALSE IED blocked Protection working as in Normal mode but ACT configuration can be used to...

Страница 101: ...rip from TRPPTRC1 is blocked and in the control blocking example CBXCBR1 is blocked Both comply with IEC 61850 In real applications some of PTRC s might also be used for signalling purposes GOOSE and...

Страница 102: ...ECTED EXE_OP EXE_CL OP_REQ CL_REQ OPENPOS CLOSEPOS OKPOS OPEN_ENAD CLOSE_ENAD Control CTRL_OFF CTRL_LOC CTRL_STA CTRL_REM CTRL_ALL OFF LOCAL STATION REMOTE ALL BEH_TEST BEH_BLK AND B1 B2 O AND B1 B2 O...

Страница 103: ...t user categories create single line diagrams shown on the LHMI and WHMI and symbols and provide language translations for the added LHMI elements 1 To configure the single line diagram check if any n...

Страница 104: ...d 6 1 2 1 Measurements page The Measurements page contains two configurable measurement lists The buttons at the bottom of the page are used to navigate to other measurement related pages Phasors Load...

Страница 105: ...operties pane click on the listId row to browse the available signals GUID 5DFE94FB 94AC 4164 93A7 39954AEAC4E9 V1 EN Figure 73 Accessing the signals 3 In the Signal Group Selection dialog select chec...

Страница 106: ...be independently configured in the Object Properties pane Click a measurement to select the measurement item Then click the same item again to select the measurement list Set the measurement propertie...

Страница 107: ...r for the measurements if needed The smaller the order property the higher the measurement s position in the measurement list By default all measurement list items are arranged in alphabetical order M...

Страница 108: ...removing signal groups Add a new signal group 1 In Signal Grouping Editor dialog click Add 2 In Enter Group Name dialog type the signal group name 3 Click OK GUID 6DA666AA F4FE 466C 87BA 4B28517C882C...

Страница 109: ...78 Removing a signal group Adding and removing signals Add new signals 1 In Signal Grouping Editor dialog select a group from the Signal Group drop down list 2 In List of All Signals list select the r...

Страница 110: ...configuring the main screen of LHMI by creating main pages and linked pages Pages can be added removed or reordered in Page Organizer and for example their visibility can be set to Basic or Advanced T...

Страница 111: ...lates Templates allow replicating the same configuration with less effort New pages can be created by selecting a template page so that the new page becomes a new instance of the template page Templat...

Страница 112: ...ng pages 2 In the Add Page dialog select a predefined ABB built in page or a template page and click Add Define unique names for all main and linked pages regardless of their type GUID 6553B5A2 F820 4...

Страница 113: ...ight click the page and click Save as Template GUID C1F6AA54 5A46 4467 A55C 2BE8562B49E2 V1 EN Figure 83 Saving templates 6 1 4 Page Editor Page Editor is used for configuring pages Pages can be confi...

Страница 114: ...LDViewPort The SLDViewPort widget displays the single line diagram configured in SLD Editor 1 Drag the SLDViewPort widget from the Object Types pane to the page 2 In Object Properties select the requi...

Страница 115: ...ct properties pane Once widgets are placed on the HMI page some of them Monitors can be linked to the corresponding function block in the application configuration by using the source property The val...

Страница 116: ...conditions For example the LED color can be changed to red if the signal value is high or to green if button2 is checked Otherwise the LED color is yellow GUID 77CF95D9 429A 4FCB 99B3 79FD4B34E1C6 V1...

Страница 117: ...raphics are saved in svg format and written to the IED There are several options for the symbol size 1x1 normal size 1x2 height is doubled 2x1 width is doubled and 2x2 both the height and width are do...

Страница 118: ...lect Create Symbol Right click the symbol library and click Create Symbol On the toolbar click 2 In the Create Symbol dialog specify a name category size and states and click Create GUID C7517243 D9A5...

Страница 119: ...in SLD Editor via the symbol s Signals property 4 1 On the menu bar point to Graphical Display Editor point to Symbol Editor point to Symbol and select Object Properties 4 2 Select Signals property a...

Страница 120: ...symbol is of control type select the correct value in the control dialog drop down list GUID 1345124A 1824 443D A90C 0A3DB67BEE0B V1 EN Figure 92 Selecting the control dialog type 5 Save the symbol t...

Страница 121: ...ify a name and click Create 6 1 5 4 Creating states The symbol can have different states that represent the graphics for the symbol The symbol graphics are different for each state The state is select...

Страница 122: ...of an event Single line diagrams support both ANSI and IEC standards Single line diagrams created in ANSI can be changed to IEC and vice versa by changing the symbol standard in PCM600 Custom symbols...

Страница 123: ...page and select the Remove Page option in the context menu The relay supports a maximum of 10 SLD pages SLD Page Editor is used for various tasks Adding static text Adding measurands Adding bus bars...

Страница 124: ...1 Right click anywhere on the page and select Show Bus Bar Coloring 2 In the SLD Logic Window dialog click to add a new color group or x to remove an existing color group 3 Expand any color group and...

Страница 125: ...osition is closed it should be indicated in green color Otherwise the color is black IF CBXCBR1 1 POSITION open THEN Line Color is Red ELSE CBXCBR1 1 POSITION closed THEN Line Color is Green ELSE Line...

Страница 126: ...adjust the placement of symbols in the single line diagram Use controlState to define the default state of the symbol to be displayed in the view Use indicationOnly to define if the symbol is controll...

Страница 127: ...These are the default and recommended settings when designing a single line diagram 3 Place the primary equipment on the single line diagram approximately in the wanted position If required rotate th...

Страница 128: ...f the symbols to become deactivated 7 Select a symbol and modify its properties in the Object Properties pane The symbol name can also be changed by double clicking the symbol 8 In the Object Properti...

Страница 129: ...that the corresponding language binary is loaded in the IED and that the corresponding language pack for the connectivity package is installed in the PC A warning message is displayed by the tool if t...

Страница 130: ...D The soft LHMI is a Windows version of the actual LHMI To launch the soft LHMI and to preview the configuration click the Show Preview button GUID BC7D2EB6 D6CC 410C B73E 0FDF3568C762 V1 EN Figure 10...

Страница 131: ...the File menu point to Display Editor Template and select Import 2 Click Browse to select any previously exported template file in pgdep format and click Open 3 In the GDE Import dialog select the pa...

Страница 132: ...h a name that is used by an existing page a confirmation dialog is displayed The options are to overwrite the existing page to create a new page with a different name or to cancel the import GUID DD01...

Страница 133: ...e view The events in the tree view are structured in the same way as the functions in the PCM600 plant structure GUID 85946278 79B5 45FC B454 454E59831079 V1 EN Figure 105 HMI Event Filtering interfac...

Страница 134: ...clear the check box next to the event name to specify its visibility GUID F8C4C841 2C58 424A AF8E 9C8DBCF77C98 V1 EN Figure 106 Setting visibility of the HMI events The event is visible on both LHMI a...

Страница 135: ...an event to an alarm The programmable LEDs approach is similar to the traditional programmable LEDs where instead of a physical LED a virtual LED user interface element is used 6 3 1 Alarm list Any vi...

Страница 136: ...n the check box is selected 3 Select or clear the check box in the Priority column to elevate an event to a priority alarm When the check box is selected the event is visible as a priority alarm on bo...

Страница 137: ...ted when the configuration is modified 6 3 2 Virtual programmable LEDs 6 3 2 1 Configuring virtual programmable LEDs Three steps must be completed to enable programmable LEDs in the relay s HMI 1 Inst...

Страница 138: ...130...

Страница 139: ...as described in the IEC 61850 standard The technical manual describes the function blocks defined as logical nodes IEC 61850 engineering guide IEC 61850 conformance documents for the protection relay...

Страница 140: ...communication interface principle IEC 61850 provides a method for identifying all signals that belong to a function These signals are identified through the logical nodes representing the functions A...

Страница 141: ...y data attributes or data objects that belong to the GOOSE message data set In the opposite direction the standard only defines the IED as a receiver of a GOOSE message How the GOOSE input signals are...

Страница 142: ...cific IED The CID file contains the complete configuration description of the IED the configured IED name communication part data sets and all control blocks IID Instantiated IED description The IID f...

Страница 143: ...ile SCD file do IED engineering export SCD file PCM600 1 create project import SCD file configuredata sets configure Report CBs configure GOOSE CBs export SCD file IET 600 2 import SCD file link GOOSE...

Страница 144: ...log box select the location to store the file and name it 4 Click Save GUID E679FF94 09CC 4D9D A0B3 2A69557DE6A6 V1 EN Figure 113 IEC 61850 selecting the SCL export option 5 In the SCL Export Options...

Страница 145: ...port dialog box from the Save as type list select the type of file to export Configured IED description cid for the IEC 61850 structure as needed for the IED at runtime IED capability description icd...

Страница 146: ...854 3D0A 43E2 B945 80E89710C3B8 V1 EN Figure 117 Selecting the SCL file version 7 Click Export 7 3 2 Engineering vertical and horizontal communication For IEC 61850 engineering a separate system confi...

Страница 147: ...ACT DPS DPC INC INS ENC and ENS 3 3 Configure additional Report Control Blocks when needed for each data set used for vertical communication 3 4 Link the IED clients to the Report Control Blocks Up to...

Страница 148: ...select Options and click IEC 61850 Configuration 2 On the Engineering tab clear the option IED 61850 configuration engineering mode enabled and click OK GUID 3B18C93E 5450 43B1 823F 02C640D5FCB0 V1 E...

Страница 149: ...tegrate this kind of IEDs into the plant structure for example Click Ignore PCM Object Type to update the IED objects in PCM600 with the IED types in the SCD file whether or not the IED types in the S...

Страница 150: ...e to IED operation 7 3 3 2 Importing ICD or CID files 1 Select an existing IED 2 From the Files of type list select the IEC 61850 file type to be imported ICD or CID 3 In the SCL Import Option dialog...

Страница 151: ...he SCD file 4 Click Import when the definition has been completed A progress view displays the importing procedure 7 3 4 Writing communication configuration to IED IEC 61850 communication depends on t...

Страница 152: ...the IED Select Process bus IEC 61850 9 2 to update the IEC 61850 9 2 configuration part in the IED The options can be left unselected In this case other parts of the configuration are updated 2 Select...

Страница 153: ...collection of software and information related to a specific protection and control IED providing system products and tools to connect and interact with the IED DA Data attribute DHCP Dynamic Host Co...

Страница 154: ...protection function stage can be established IP Internet protocol IP address A set of four numbers between 0 and 255 separated by periods Each server connected to the Internet is assigned a unique IP...

Страница 155: ...s SNTP Simple Network Time Protocol Subnet mask A set of four numbers used to create IP address numbers that are used only within a particular network subnet TCP Transmission Control Protocol UDP User...

Страница 156: ...BB Distribution Solutions Distribution Automation P O Box 699 FI 65101 VAASA Finland Phone 358 10 22 11 www abb com mediumvoltage www abb com relion Copyright 2019 ABB All rights reserved 1MRS759117 A...