10.4.7.4
Verifying the back-up trip mode
SEMOD128582-115 v2
In the cases below it is assumed that
FunctionMode
=
Current
is selected.
Checking that back-up tripping is not achieved at normal CB tripping
SEMOD128582-119 v4
Use the actual tripping modes. The case below applies to re-trip with current check.
Procedure
1.
Apply the fault condition, including START of CCSRBRF, with phase current
well above set value
IP>
.
2.
Arrange switching the current off, with a margin before back-up trip time,
t2
.
It may be made at issue of re-trip command.
3.
Check that re-trip is achieved, if selected, but no back-up trip.
4.
Disconnect AC and start input signals.
10.4.7.5
Verifying instantaneous back-up trip at “CB faulty” condition
SEMOD128582-167 v4
Applies in a case where signal “CB faulty and unable to trip” is connected to input
CBFLT.
Procedure
1.
Repeat the check of back-up trip time. Disconnect current and START input
signals.
2.
Activate the input CBFLT. The output CBALARM (CB faulty alarm) should
appear after set time
tCBAlarm
. Keep the input activated.
3.
Apply the fault condition, including START of CCSRBRF, with current
above set current value.
4.
Verify that back-up trip is obtained without intentional delay, for example,
within 20ms from application of START.
5.
Disconnect injected AC and input signals.
10.4.7.6
Verifying the case
FunctionMode = Contact
SEMOD128582-183 v4
It is assumed that re-trip without current check is selected,
RetripMode
=
No
CBPos Check
.
Procedure
1.
Set
FunctionMode
=
Contact
.
2.
Apply input signal for CB closed to relevant input or inputs CBCLD
3.
Apply input signal, or signals for START of CCSRBRF. The value of current
could be low.
4.
Verify that re-trip and back-up trip are achieved after set times.
5.
Disconnect the START signal(s). Keep the CB closed signal(s).
1MRK 505 372-UEN A
Section 10
Testing functionality by secondary injection
Busbar protection REB670 2.2 IEC
103
Commissioning manual
Содержание RELION REB670
Страница 1: ...RELION 670 SERIES Busbar protection REB670 Version 2 2 IEC Commissioning manual...
Страница 2: ......
Страница 14: ...8...
Страница 32: ...26...
Страница 46: ...40...
Страница 62: ...56...
Страница 66: ...60...
Страница 166: ...160...
Страница 176: ...170...
Страница 194: ...188...
Страница 195: ...189...