![ABB RELION REB670 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/abb/relion-reb670/relion-reb670_commissioning-manual_3519034010.webp)
Thermal overload protection, two time constants TRPTTR ........95
Checking operate and reset values........................................95
Completing the test................................................................ 96
Breaker failure protection, phase segregated activation and
output CCRBRF...........................................................................96
Checking the phase current operate value,
Checking the residual (earth fault) current operate value
IN> set below IP>................................................................... 97
Checking the re-trip and back-up times..................................97
Verifying the re-trip mode....................................................... 97
Verifying the back-up trip mode..............................................98
Verifying instantaneous back-up trip at CB faulty condition... 99
Verifying the function mode
Current/Contact......................... 99
Completing the test.............................................................. 100
Breaker failure protection, single phase version CCSRBRF .... 100
Checking the phase current operate value IP>.................... 101
Checking the re-trip and back-up times................................101
Verifying the re-trip mode..................................................... 102
Verifying the back-up trip mode............................................103
Verifying instantaneous back-up trip at “CB faulty”
FunctionMode = Contact.........................103
Curr&Cont Check.....................104
Completing the test.............................................................. 105
Directional underpower protection GUPPDUP .........................105
Verifying the settings............................................................ 105
Completing the test.............................................................. 107
Directional overpower protection GOPPDOP ...........................107
Verifying the settings............................................................ 107
Completing the test.............................................................. 108
Capacitor bank protection CBPGAPC.......................................108
Verifying the settings and operation of the function............. 108
Completing the test.............................................................. 112
Voltage protection...........................................................................112
Two step undervoltage protection UV2PTUV ...........................112
Verifying the settings............................................................ 112
Completing the test.............................................................. 114
Two step overvoltage protection OV2PTOV .............................114
Verifying the settings............................................................ 114
Extended testing...................................................................115
Completing the test.............................................................. 115
Two step residual overvoltage protection ROV2PTOV ............ 115
Verifying the settings............................................................ 115
Completing the test.............................................................. 116
Table of contents
4
Busbar protection REB670 2.2 IEC
Commissioning manual
Содержание RELION REB670
Страница 1: ...RELION 670 SERIES Busbar protection REB670 Version 2 2 IEC Commissioning manual...
Страница 2: ......
Страница 14: ...8...
Страница 32: ...26...
Страница 46: ...40...
Страница 62: ...56...
Страница 66: ...60...
Страница 166: ...160...
Страница 176: ...170...
Страница 194: ...188...
Страница 195: ...189...