Fuse failure supervision SDDRFUF............................................68
Checking that the binary inputs and outputs operate as
expected ................................................................................68
Measuring the operate value for the negative sequence
function ..................................................................................69
Checking the operation of the du/dt and di/dt based
function ..................................................................................70
Completing the test................................................................71
Testing control functions...................................................................71
Synchrocheck, energizing check, and synchronizing
SESRSYN...................................................................................71
Testing the synchronizing function.........................................73
Testing the synchrocheck check............................................74
Testing the energizing check..................................................76
Testing the voltage selection..................................................78
Completing the test................................................................78
Autorecloser SMBRREC ............................................................78
Preparation of the verification ................................................80
Switching the autorecloser function to
Verifying the autorecloser function SMBRREC .....................81
Checking the reclosing conditions .........................................82
Completing the test................................................................83
Testing logic functions......................................................................84
Tripping logic SMPPTRC ............................................................84
Three phase operating mode.................................................84
Circuit breaker lockout............................................................84
Completing the test................................................................85
Testing monitoring functions.............................................................85
Event counter CNTGGIO.............................................................85
Testing metering functions...............................................................85
Pulse counter PCGGIO...............................................................85
Exit test mode...................................................................................86
Section 7 Commissioning and maintenance of the fault
clearing system..............................................................87
Commissioning and maintenance of the fault clearing system.........87
Installation and commissioning....................................................87
Commissioning tests...................................................................88
Periodic maintenance tests.........................................................88
Visual inspection....................................................................89
Table of contents
4
Commissioning Manual