
Additional information
Task
Close the AC disconnectors [-1Q4 and -2Q4] of
both inverters.
See
PVS980 commissioning and maintenance
manual
(3AXD50000046782 [EN]).
Follow the inverter commissioning procedure.
If any other optional equipment is integrated into the compact skid such as UPS,
communication equipment and others, then check the applicable documentation of the
equipment before executing the start-up procedure.
50 Start-up and operation