
Lifting
WARNING!
Inspect the container before any activity. Make sure that the container has no
protuberance, enough rings and is in good condition. Ignorance of this message
can cause physical injury, death or damage to the equipment.
Before lifting the compact skid, follow these instructions.
•
Protect the corners of the compact skid against shock.
•
The minimum length of each sling or chains with shorteners is five meters.
•
Adjust the length of lifting sling or chains so that the compact skid does not tilt during
lifting.
•
Do not allow the lifting slings to scratch the walls or roof. Damaged paint can lead to
corrosion.
•
Use a guide wire attached to a lower corner of the compact skid to prevent rotation.
■
Tools used for lifting
•
Two 30 tons cranes
•
Two spreaders 17 tons of 2,10 meters / 6.89 ft //to do: should this be 2.10 meters?
•
Eight sling or chains 8 tons
•
Loading/unloading area of approximately 32 m x 8 m (considering 40 ft HC container,
auxiliary platform and crane space).
Storing, lifting and transporting 31