40 Planning the electrical installation
Routing the cables
Install the DC power cable, output AC power cable and the control cabling on separate
routes. The cable trays must have good electrical bonding to each other and to the
grounding electrodes.
Where control cables cross power cables, make sure that you set them at an angle as
near to 90 degrees as possible. Do not run additional cables through the inverter.
If four conductor AC cabling is used, install the three output phase cables symmetrically
and close to each other. Asymmetrical installation may induce current to grounding cables
and metal structures.
Separate control cable ducts
90°
DC input cable
AC output power cable
Control cables
min. 500 mm (19.7 in.)
Inverter
min. 500 mm (19.7 in.)
24 V
24 V
230 V
Lead 24 V and 230 V (120 V) control
cables in separate ducts inside the cabinet.
Not allowed unless the 24 V cable is
insulated for 230 V (120 V) or insulated with
an insulation sleeving for 230 V (120 V).
(120 V)
230 V
(120 V)
Содержание PVS800-57B
Страница 1: ... ABB SOLAR INVERTERS PVS800 57B central inverters Hardware manual ...
Страница 4: ......
Страница 8: ...8 ...
Страница 16: ...16 Safety instructions ...
Страница 30: ...30 Operation principle and hardware description ...
Страница 32: ...32 Planning the mechanical installation ...
Страница 62: ...62 Dimension drawings Cabinet dimensions ...
Страница 63: ...Dimension drawings 63 ...
Страница 64: ...64 Dimension drawings Cabinet attachment points ...
Страница 65: ...Dimension drawings 65 ...
Страница 66: ...66 Dimension drawings AC and DC cabling lead throughs ...
Страница 67: ...Dimension drawings 67 ...
Страница 68: ...68 Dimension drawings AC cabling ...
Страница 69: ...Dimension drawings 69 ...
Страница 70: ...70 Dimension drawings DC cabling ...
Страница 71: ...Dimension drawings 71 ...
Страница 72: ...72 Dimension drawings ...