Safety instructions 15
Safe start-up and operation
These warnings are for all personnel who commission, plan the operation or operate the
inverter.
WARNING!
Obey these
instructions to prevent injury or death, or damage to the
equipment.
•
Keep the door of the inverter locked when it operates. Give the keys only
to authorized
personnel.
•
Before you start the inverter, close the main AC breaker or main AC switch
disconAC-Q2 and DC switch disconDC-Q1, auxiliary power supply
+AC-F30 or external auxiliary power supply.
•
When the inverter operates, do not open the AC or DC main switches.
•
Before you adjust the inverter and put it into service, make sure that all of the
equipment is suitable for operation.
•
The maximum allowed number of power-ups by applying power is five in ten minutes.
•
Do not use the inverter in a manner not specified in this manual.
Do not stay close to the inverter while the inverter is starting up or in running state. Adjust
the start-up delay in a way that you have sufficient time to vacate the inverter room.
Содержание PVS800-57B
Страница 1: ... ABB SOLAR INVERTERS PVS800 57B central inverters Hardware manual ...
Страница 4: ......
Страница 8: ...8 ...
Страница 16: ...16 Safety instructions ...
Страница 30: ...30 Operation principle and hardware description ...
Страница 32: ...32 Planning the mechanical installation ...
Страница 62: ...62 Dimension drawings Cabinet dimensions ...
Страница 63: ...Dimension drawings 63 ...
Страница 64: ...64 Dimension drawings Cabinet attachment points ...
Страница 65: ...Dimension drawings 65 ...
Страница 66: ...66 Dimension drawings AC and DC cabling lead throughs ...
Страница 67: ...Dimension drawings 67 ...
Страница 68: ...68 Dimension drawings AC cabling ...
Страница 69: ...Dimension drawings 69 ...
Страница 70: ...70 Dimension drawings DC cabling ...
Страница 71: ...Dimension drawings 71 ...
Страница 72: ...72 Dimension drawings ...