44 Electrical installation
AC output cable connection procedure
Refer to the dimension drawings in the
PVS800-57B central inverters hardware manual
(3AXD50000048300 [EN]).
1. Remove the shroud from the output power terminals.
2. Put the cable(s) into the cabinet.
3. If it is a shielded cable, prepare the cable ends and do the 360° grounding at the
cabinet entry. Connect the twisted shield of the AC output cable(s) to the cabinet PE
(ground) busbar with a cable lug.
4. Connect the phase conductors to terminals L1, L2 and L3.
5. If it is present, connect the separate PE/grounding conductor to the cabinet PE
(ground) busbar.
6. Install the shroud on to the output power terminals.
a
AC output terminals L1, L2, L3
a) Cable lead-throughs
L1
L2
L3
Содержание PVS800-57B
Страница 1: ...ABB SOLAR INVERTERS PVS800 57B central inverters Commissioning and maintenance manual...
Страница 4: ......
Страница 8: ...8...
Страница 16: ...16 Safety instructions...
Страница 22: ...22 Introduction to the manual...
Страница 27: ...Storing lifting and transporting 27 Moving the crate with a forklift...
Страница 38: ...38 Mechanical installation...
Страница 50: ...50 Electrical installation...
Страница 56: ...56 Start up and operation...
Страница 70: ...70 Maintenance 5 6 4 3...
Страница 71: ...Maintenance 71 7 8 8...
Страница 72: ...72 Maintenance 9 10...
Страница 76: ...76 Maintenance...