Electrical installation 43
DC input cable connection procedure
Refer to the dimension drawings in the
PVS800-57B central inverters hardware manual
(3AXD50000048300 [EN]).
1. Remove the shroud
from the input power terminals.
2. Put the cable(s) into the inside of the cabinet.
3. If it is a shielded cable, connect the shield to the cabinet grounding busbar with a cable
lug.
4. Connect the DC- conductor to terminal
DC- and the DC+ conductor to terminal DC+.
5. If there is a separate PE conductor, connect it to the cabinet grounding terminal.
6. Refit the shroud onto the input power terminals.
DC input terminals DC-, DC +
a) Cable lead-throughs
a
DC
-
DC
+
a
DC
+
DC
-
PE
Содержание PVS800-57B
Страница 1: ...ABB SOLAR INVERTERS PVS800 57B central inverters Commissioning and maintenance manual...
Страница 4: ......
Страница 8: ...8...
Страница 16: ...16 Safety instructions...
Страница 22: ...22 Introduction to the manual...
Страница 27: ...Storing lifting and transporting 27 Moving the crate with a forklift...
Страница 38: ...38 Mechanical installation...
Страница 50: ...50 Electrical installation...
Страница 56: ...56 Start up and operation...
Страница 70: ...70 Maintenance 5 6 4 3...
Страница 71: ...Maintenance 71 7 8 8...
Страница 72: ...72 Maintenance 9 10...
Страница 76: ...76 Maintenance...