Operation Manual / Power2 340-H / Low-pressure stage
7 Periodic maintenance / 7.1 Foreword to maintenance
© Copyright 2022 ABB. All rights reserved.
HZTL4053_EN
Rev.F
March 2022
7
Periodic maintenance
7.1
Foreword to maintenance
Maintenance work includes regular visual controls and cleaning operations which are inten-
ded to ensure the trouble-free functioning of the low-pressure and high-pressure stage.
In this process, the exterior condition and the degree of contamination of the components
on which maintenance work is to be performed are determined.
Component to be maintained Recommended cleaning inter-
val*
Operating state
LP & HP compressor ***
24 … 72 h
Engine load: 50 … 85%
LP filter silencer **
500 h
Engine stopped
HP bellows**
At every disassembly
Engine stopped
Table 17
* If the recommended cleaning intervals are incompatible with operation of the engine, con-
tact Turbo Systems.
** If present
*** If compressor cleaning present
Compressor cleaning
We recommend cleaning the HP compressor after the LP compressor.
On V-engines with several low-pressure and/or high-pressure stages per engine, Turbo Sys-
tems recommends the parallel cleaning of the LP compressors as well as the parallel clean-
ing of the HP compressors.
This cleaning process is faster and reduces the risk of surging of the low-pressure and high-
pressure stages.
Page
52
/
122
Содержание PT003924
Страница 2: ......